• Donnerstag, 30 April 2026
  • 15:49 Frankfurt
  • 14:49 London
  • 09:49 New York
  • 09:49 Toronto
  • 06:49 Vancouver
  • 23:49 Sydney

Marksmen Announces Operational Update

20.11.2018  |  GlobeNewswire

CALGARY, Nov. 20, 2018 - Marksmen Energy Inc. (“Marksmen” or the “Company”) is a 60% working interest owner in the Leaman #1horizontal well operated by Hocking Hills Energy and Well Services LLC of Ohio.

Marksmen is pleased to announce that on November 17, 2018 a cased-hole whip-stock assembly was successfully placed in the production casing. The whip-stock assembly was placed with a service rig and milling operations were initiated. The whip-stock will be used to begin sidetrack operations to laterally drill up to 1,500 feet in the Clinton Sandstone, which was previously stimulated with hydraulic fracturing.

Completion of milling and drilling of the lateral in the Clinton Sandstone will be accomplished using a top drive drilling rig provided by Decker Drilling of Ohio. Subject to equipment availability, work is expected to begin on or about November 28, 2018. The lateral drilling operation is expected to take approximately 10 to 15 days to complete.

For additional information regarding this news release please contact Archie Nesbitt, Director and CEO of the Company at (403) 265-7270 or e-mail ajnesbitt@marksmenenergy.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This news release, or the documents referenced may contain certain forward-looking information including without limitation the Company’s drilling and operational plans and the timing thereof. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward-looking information can be found in Marksmen’s disclosure documents on the SEDAR website at www.sedar.com. Marksmen does not undertake to update any forward-looking information except in accordance with applicable securities laws.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Unternehmen dieses Artikels
Unternehmen Land WKN Symbol Profil News News, engl. Forum Details
Marksmen Energy Inc. Kanada Kanada A1T9MR MAH.V      
© 2007 - 2026 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)