NRG Metals Inc. is pleased to report it has issued and filed a technical report titled "Initial Measured Lithium and Potassium Resource Estimate Hombre Muerto North Project, Salta and Catamarca Provinces, Argentina." The report was completed in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, on behalf of the Company by independent consultants Montgomery and Associates, of Santiago [...]
HIGHLIGHTS 756 parts per million Li contained within 571,000 tonnes in the Measured Indicated Categories Low magnesium to lithium ratio of 2.6 to 1.0 Second well pumps at 20 liters per second limited only by pump size NRG Metals Inc. is pleased to provide additional information regarding the maiden lithium and potassium resource statement for its Hombre Muerto Norte lithium brine project in the Salta province of [...]
NRG Metals Inc. is pleased to report a maiden lithium and potassium resource statement for its Hombre Muerto Norte lithium brine project in the Salta province of Argentina. The NI 43-101 resource statement, detailed in Table 1 below, includes 509,000 tonnes of lithium carbonate equivalent and 1,609,000 tonnes of potash equivalent in the Measured and Indicated Resource categories, with an additional 62,000 tonnes of LCE [...]
NRG Metals Inc. The Company is pleased to announce that it has completed the third installment of it's purchase option for the Hombre Muerto North Lithium Project , located in Salta Province, Argentina. A payment of $ US 250,000 and one million common shares have been made to the vendor as per the contract terms. The vendor has also become an insider of the Company as defined by Canadian securities regulations. The [...]
Maiden Resource Estimate Expected Shortly VANCOUVER, Sept. 21, 2018 /CNW/ - NRG Metals Inc. The Company is pleased to announce the completion of a second pumping well at the Hombre Muerto North Lithium Project, Salta, Argentina. The well, designated TWW18-02, was drilled to the target depth of 400 meters, and it is located immediately adjacent to core hole TH18-02, which was described in the company's press releases dated [...]
HIGHLIGHTS NRG's second drill hole at the Hombre Muerto North project has been completed to a depth of 280.8 m, and the sample results demonstrate that excellent lithium values are present in the lower portion of the hole. Based on these encouraging results, as well as the excellent results from the pumping well located approximately 2.1 kilometers to the east, NRG has decided to drill a second pumping well adjacent to [...]
NRG Metals Inc. the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina. The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of [...]
- Initial sample results for the second core hole indicate excellent lithium values with very low Mg/Li ratios. The arithmetic average of three samples taken to a depth of 61.5 m is 719 mg/l lithium with a magnesium to lithium ratio ranging from 2.1 to 3.3 VANCOUVER, British Columbia, July 10, 2018 /CNW/ -- NRG Metals Inc. is pleased to report the initial assays for samples from the second diamond drill hole at the Hombre [...]
VANCOUVER, British Columbia, June 29, 2018 /CNW/ -- HIGHLIGHTS Brine samples collected from 300 to 401 meters show high grade values very similar to the assays previously reported for the samples from surface to a depth of 300 m, with an arithmetic average 918 mg/l lithium and a low magnesium to lithium ratio. The arithmetic average lithium concentration for all of the samples from the surface to a depth of 401 m is 900 [...]
HIGHLIGHTS • Brine samples collected from 100 meters to 300 meters show high grade values very similar to the assays for the samples from surface to a depth of 100 meters, with an arithmetic average 888 mg/l Li and a low Mg to Li ratio. • The hole has been completed to a depth of 401 meters, and sample results from 300 to the bottom of the hole are pending. • Adjacent rotary drill hole for pump testing has [...]
Pumping test well drilled to 309 meters Target depth set at 400 meters Geology identical to adjacent core hole. VANCOUVER, May 25, 2018 /CNW/ - NRG Metals Inc. the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule. The rotary hole, which is located 15 meters east of the core hole currently underway, is now at 309 meters, with an [...]
Highlights Brine samples collected over the first 100 meters average 905 mg/l Li with a low Mg to Li ratio. The hole is now at 300.5 meters in clastic sediments, and brine samples are currently being collected from 300 to 100 meters. Drilling will resume after the sampling is completed. Adjacent rotary drill hole for pump testing is at a depth of 173 meters. VANCOUVER, May 24, 2018 /CNW/ - NRG Metals Inc. the Company [...]