• Sonntag, 12 April 2026
  • 13:58 Frankfurt
  • 12:58 London
  • 07:58 New York
  • 07:58 Toronto
  • 04:58 Vancouver
  • 21:58 Sydney
Lithium South Development Corp.
Bergbau
Originalaktie
A2QGR9 / CA53680U1093
Minengesellschaft
AuAgPtPdCuNiZnLi

Argentinien

  • Hole AS01 seven samples range from 693 mg/L Li to 744 mg/L Li Hole AS01 hole lithium average is 722 mg/L Li Hole AS01 brine zone is defined across a 240 m zone Hole AS03 five samples collected with two assays received Hole AS03 two assays 749 mg/L Li and 752 mg/L Li Hole AS03 hole lithium average is 751 mg/L Li``` Hole AS03 brine zone is defined across a 140 m zone Drilling will begin on newly added hole AS02 [...]
    01.11.2022
    von CNW
  • Lithium South Development Corp. is pleased to provide an update on the drilling campaign currently underway at the Hombre Muerto North Lithium Project in Salta Province, Argentina. Two rigs are operating on site, and drilling is progressing according to schedule. The current exploration is located within the Alba Sabrina claim block. This area at 2,089 hectares is the largest of the 3,287 hectare claim package. The [...]
    06.10.2022
    von CNW
  • Lithium South Development Corp. is pleased to provide an update on the drilling campaign currently underway at the Hombre Muerto North Lithium Project in Salta Province, Argentina. The first hole AS01 has now been completed to a depth of 270 meters. As the first hole has progressed, drilling has become very difficult due to geological instability. The decision was made to conclude the hole at this depth, though geological [...]
    25.08.2022
    von CNW
  • Lithium South Development Corp. . The Company is pleased to provide an update on process test work currently being conducted on a 12,500-liter bulk brine sample from the Hombre Muerto North Lithium Project , located in Salta. Argentina. The purpose of the test work is to validate evaporation as a viable concentration method to produce battery grade lithium carbonate. The work is performed as part of the preparations for a [...]
    19.08.2022
    von CNW
  • VANCOUVER, BC , Aug. 17, 2022 /CNW/ -- Lithium South Development Corp. is pleased to provide an update on the drilling campaign currently underway at the Hombre Muerto North Lithium Project in Salta Province, Argentina. Andalgala Perforaciones S.A. of Catamarca, Argentina have been contracted to provide a second core rig for drilling at the project site. The rig is expected to be located by this coming weekend at the [...]
    17.08.2022
    von CNW
  • HIGHLIGHTS 1. Five double packer samples obtained from first hole AS01 2. Lithium values range from 732 mg/l lithium to 772 mg/l lithium 3. Lithium magnesium ratio remains favorable at under 4 to 1 4. Drilling will continue to basement rock Lithium South Development Corp. is pleased to provide an update on the drilling campaign currently underway at the Hombre Muerto North Lithium Project Salta Province, Argentina. First [...]
    10.08.2022
    von CNW
  • Lithium South Development Corp. is pleased to provide an update on process test work currently underway at the Hombre Muerto North Lithium Project , located in Salta, Argentina. The purpose of the test work is to validate evaporation as a viable concentration method in preparation for a potential on site pilot plant and subsequent Feasibility Study. The work is being performed by Eon Minerals a Delaware based company with [...]
    07.07.2022
    von CNW
  • Lithium South Development Corp. is pleased to announce that drilling has commenced at the Hombre Muerto North Lithium Project , Salta Province, Argentina. Servicios Gelogicos of Salta, Argentina began to turn the first hole on June 12th. The drilling method is diamond drill hole with double packer sampling at select intervals. The 2,000 meter drill program is expected to continue for the next several months, with results [...]
    21.06.2022
    von CNW
  • Lithium South Development Corp. is pleased to announce it has retained Groundwater Insight Inc. of Halifax, Nova Scotia to provide technical services regarding the Hombre Muerto North Lithium Project located in Salta, Argentina. The services will include the preparation of a National Instrument Compliant Resource Estimate, and the preparation of all supporting documents. Dr. Mark King will serve as the Qualified Person [...]
    11.05.2022
    von CNW
  • Lithium South Development Corp. is pleased to announce the initiation of a resource expansion drill program at the Hombre Muerto North Lithium Project , Salta, Argentina. The Company has retained Servicios Geologicos of Salta, Argentina, to conduct a 2,000-meter core hole drill program on the Alba Sabrina claim block. At 2,089 hectares, the Alba Sabrina claim block is the largest of the nine block, 5,687-hectare project [...]
    26.04.2022
    von CNW
  • Lithium South Development Corp. is pleased to announce finalization of the Environmental Baseline Study for the Hombre Muerto North Lithium Project , Salta, Argentina. E&C Consultores of Salta have been completing the final in field survey, collecting data on the Flora, Fauna, hydrology, and climate in areas of project influence during the rainy season. The final results are being prepared under the General Environmental [...]
    17.03.2022
    von CNW
  • Lithium South Development Corp. is pleased to announce that road access and drill pads have been completed and a 2000 Meter drill program is staged to commence at the HMN Li Project, Salta Province, Argentina. The three pads constructed on the Alba Sabrina claim block are approximately 2.5 kilometers apart across the project area, north to south. The drill program consists of three drill holes, one per pad. At 2,089 [...]
    03.03.2022
    von CNW


© 2007 - 2026 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)