Highlights: Revenue for the year was $87.3 million - a decrease of 2% from 2024. Revenue for 2025-Q4 was $18.2 million - a decrease of 27% from 2024-Q4. Production, revenue, and net income were negatively affected by the labour disruption, which shut down operations from September 9 through November 5, 2025, resulting in a loss of 58 production days between Q3 and Q4. Total Comprehensive Income for the year, net of [...]
Soma Gold Corp. is pleased to provide a comprehensive operational update across its Colombian mining portfolio, highlighting strong progress toward increased production and improved operating performance. Operational Momentum Building Across Multiple Assets Soma continues to advance its multi-mine growth strategy, with key operations transitioning into production and contributing to a strengthening production profile [...]
Soma Gold is pleased to announce that it has submitted the PTO mining permit application for its Nechí Project. Nechí is an underground development project. It comprises the El Catorce, Santa Elena, and Santa María deposits, all of which have undergone successful test mining with mineralized material processed at the Company's El Bagre Mill. Existing underground workings at Nechí are expected to facilitate an accelerated [...]
Soma Gold is pleased to announce that its Colombian subsidiary, Operadora Minera, has successfully renewed its carbon neutrality certification for the 2024 reporting period, marking the second consecutive year the Company has achieved this distinction. The certification, independently verified and issued by Bureau Veritas - BVQI Colombia Ltd., confirms that Operadora has maintained carbon neutrality for Scope 1 and Scope [...]
Highlights: First small mine completed formalization process Ore sorting equipment arrives in Colombia Nechi Permit Application pending Soma Gold Corp. is pleased to announce that the first delivery of mined material from the formalized Diamantina Mine has been received at the El Limon Mill in Zaragoza, Antioquia, Colombia. The Diamantina Mine was formalized under Colombian law after more than five years of effort. The [...]
Soma Gold Corp. is pleased to announce that the Colombian government has issued drill permits for the copper anomaly in the Psyche 2 target area of the Machuca Project in Antioquia, Colombia . A large survey completed in 2025 identified a significant copper anomaly coincident with a prominent magnetic high at the Psyche 2 target area . A drill rig has been mobilized to the first drill pad at the northern end of the Copper [...]
Soma Gold Corp. is pleased to announce that, following positive additional bench-scale sensor-based sorting test work, it has signed a definitive agreement to purchase and install a sensor-based sorting facility at its flagship El Bagre operation in Antioquia, Colombia. The total project budget for the pilot installation is approximately US$2.2 million. Commissioning of the sorting facility is targeted for the first half [...]
Highlights include the following drill intercepts: CVDDH-25-013: 9.4 g/t Au over 1.35 m, including 16.5 g/t Au over 0.75 m CVDDH-25-015: 7.7 g/t Au over 1.5 m, including 23.0 g/t Au over 0.5 m CVDDH-25-015: 6.6 g/t Au over 1.5 m, including 19.8 g/t Au over 0.5 m CVDDH-25-018: 10.3 g/t Au over 1.0 m, including 20.5 g/t Au over 0.5 m Drilling confirms the Cordero Deposit remains open along strike and at depth Drilling at [...]
Soma Gold is pleased to announce drill results targeting the "Atenas" Zone of the Cordero Mine on the Bagre Project. Thirty-eight diamond drill holes from underground and surface drill stations have been completed, totaling 6,737 m. The drill program was designed to provide infill drilling to support mining operations and test the dip and strike extent of the Atenas Zone. The drilling results outlined in this press [...]
Highlights: Production, revenue, and net income were negatively affected by the labor disruption, which shut down operations from September 9 through November 5, 2025, resulting in a loss of 22 production days in Q3. Revenue for Q3 2025 was $18.1 million, and $69.0 million for the nine months ended September 30, 2025 - an increase of $4.6 million compared to the nine months ended September 30, 2024, despite the work [...]
Soma Gold Corp. is pleased to provide an update on the ongoing soil sampling program at its Psyche 2 target area within the Machuca Project in Antioquia, Colombia . Psyche 2 was initially identified through high-grade stream sediment samples and the presence of informal, small-scale mines . The Company has since expanded the soil sampling program northward along a prominent, linear, north-south-trending magnetic high that [...]
Soma Gold announces that production has recommenced at both the Cordero Mine and the El Bagre Gold Complex after 57 days of work stoppage as a result of the strike by unionized employees. Several systems at the mill require additional maintenance due to the prolonged stoppage, but this situation is being mitigated by additional leach capacity installed before the strike. Mine production will not be affected, but the [...]