Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Endeavour Mining Plc
Endeavour Mining Plc
Registriert in: Großbritannien WKN: A3CSCF Rohstoffe:
Art: Originalaktie ISIN: GB00BL6K5J42 Gold
Heimatbörse: TSX Alternativ: EDV.L
Währung: CAD    
Symbol: EDV.TO Forum:

Endeavour Mining Agbaou Exploration Results Include 32.5 gpt over 5.6 metres and 8.2 gpt over 8.8 metres

10.10.2014 | 1:22 Uhr | CNW

VANCOUVER, Oct. 9, 2014 /CNW/ - Endeavour Mining Corporation ("Endeavour" or the "Corporation") (TSX:EDV) (ASX:EVR) (OTCQX:EDVMF) reports the ongoing Agbaou exploration drilling demonstrates continuity of grades and widths of strike extensions of the deposits in the North pit and the West pit.

Table 1: Key Drilling Highlights

Deposit

Hole ID

From

 (m)

To
(m)

Length

 (m)

True Width

 (m)

Grade
(g/t Au)

MPN

AGBRC1745

20

30

10

8.0

5.0

WP

AGBRC1780

100

109

9

7.2

3.0

P2

AGBRC1837

1

78

77

Unknown

8.6

including

53

58

5

22.1

AGBRC1854

0

27

27

Unknown

7.2

including

9

13

4

34.7

P4

AGBRC1792

77

84

7

5.6

32.5

AGBRC1895

87

98

11

8.8

8.2

P6

AGBRC1843

32

51

19

15.2

4.8

 

Neil Woodyer, CEO, stated

"Results from the ongoing Agbaou drilling program are giving us confidence of being able to replace and expand our reserve base and extend the mine life at Agbaou.  The areas being drilled are immediately adjacent to the North and West pits and therefore represent similar haulage distances for any reserve that may be identified in these areas.  Drilling is returning strong grades and widths and the majority of the intercepts are near surface and therefore oxide mineralization."

The results received to date have consistently demonstrated continuity of grades and widths and confirmed the quality and interpretation of the mineralized zones. Of the 165 holes completed, 88% intersected mineralization. Additional drilling highlights with true widths, and cross sections of the P2 and P6 mineralization are provided in the appendix to this news release. 

Exploration Drill Program

A reverse-circulation ("RC") drilling program began in August 2014, and to date a total of 165 holes (15,266 metres) were drilled to confirm and further test exploration targets and extensions to the principal mineralized zones in the North and West pit areas (News Releases dated August 3, 2011, September 12, 2011 and September 6, 2012). The intercepts are shallow; all assays are at vertical depths of less than 100 metres with a majority of the intersections at depths of less than 60 metres.

Two holes on the P2 target intersected mineralization with high grades over very wide intersections (see Section A-A' in the appendix to this news release) which include 77 metres at 8.6 g/t gold (including 5 metres at 22.1 g/t gold) and 27 metres at 7.2 g/t gold (including 4 metres at 34.7 g/t gold). These wide, high-grade intersections are related to "mottled" quartz-veins, however, they appear to represent a change in orientation. Additional drilling is required to determine the orientation and strike extent of this mineralization.

These new results are currently being incorporated into the drilling database and will reduce the nominal drill spacing down to 30 metres by 20 metres over extensions of the Main and West deposits as well as new deposits in the P2, P4, P5, P6 and P7 (Figure 1) areas. General dimensions of the mineralization in these areas are provided in Table 2. This additional data will be the basis for a revised mineral resource estimate planned to improve classification of portions of the mineral resource from Inferred to at least Indicated and incorporated into a revised mineral reserve estimate. Additions to resources and reserves will be added during the normal year-end resource and reserve estimates for Agbaou.

Table 2: Agbaou 2014 Drilling Areas


Deposit

 Area

Number of New

 Holes

Additional

 Strike

(m)

Approximate

 True Width

 (m)

Depth

 tested

 (m)

North Pit

 Extensions

MPN

35

200

6-12

75

P2

18

400

8-50

100

P7

6

100

5-10

50

West Pit

 Extensions

P4

11

100

5-10

50

P5

3

50

15-25

75

P6

70

550

6-12

100

 

Qualified Persons

K. Kirk Woodman, P.Geo., GM Exploration – Burkina Faso, Cote d'Ivoire and Mali, is the Qualified Person overseeing Endeavour's exploration projects in West Africa and has reviewed and approved this press release.

All sample preparations and standard 50-gram gold fire assays were performed by Bureau Veritas Laboratories, Abidjan, Cote d'Ivoire. Endeavour consistently employs a rigorous quality control and assurance program comprising regular insertion of certified reference standards, blanks and duplicates.

About Endeavour Mining Corporation

Endeavour is a Canadian-based gold mining company producing over 450,000 ounces per year from four mines in West Africa.  Endeavour is focused on effectively managing its existing assets to maximize cash flow as well as pursuing organic and strategic growth opportunities that benefit from its management and operational expertise.

On behalf of Endeavour Mining Corporation

Neil Woodyer
Chief Executive Officer

This news release contains "forward-looking statements" including but not limited to, statements with respect to Endeavour's plans and operating performance, the estimation of mineral reserves and resources, the timing and amount of estimated future production, costs of future production, future capital expenditures, and the success of exploration activities. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" and "anticipates". Forward-looking statements, while based on management's best estimates and assumptions, are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the successful integration of acquisitions; risks related to international operations; risks related to general economic conditions and credit availability, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in countries in which Endeavour operates. Although Endeavour has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Please refer to Endeavour's most recent Annual Information Form filed under its profile at www.sedar.com for further information respecting the risks affecting Endeavour and its business.


Appendix

Agbaou 2014 Drilling Highlights

Deposit

Hole ID

UTM_E

UTM_N

From

 (m)

To

(m)

Length

 (m)

True Width

 (m)

Grade

 (g/t Au)

Final

 Depth (m)

MPN

AGBRC1734

254117

674681

49

54

5

4.0

3.9

102

including



50

51

1

0.8

15.3


AGBRC1735

254145

674663

72

78

6

4.8

1.7

126

including



73

74

1

0.8

5.5


AGBRC1744

254091

674747

0

11

11

8.8

1.7

96

including



9

10

1

0.8

12.0


AGBRC1745

254114

674734

20

30

10

8.0

5.0

108

including



21

25

4

3.2

11.7


AGBRC1746

254168

674697

68

74

6

4.8

3.4

126

including



69

70

1

0.8

8.6


AGBRC1749

254210

674764

57

66

9

7.2

2.3

78

including



58

60

2

1.6

6.3


AGBRC1751

254066

674805

71

74

3

2.4

4.9

90

including



71

72

1

0.8

8.1


AGBRC1753

254171

674740

46

51

5

4.0

3.8

102

including



47

48

1

0.8

13.2


AGBRC1756

254077

674846

44

53

9

7.2

3.0

108

including



47

50

3

2.4

6.0


AGBRC1759

254120

674869

64

70

6

4.8

4.8

84

including



65

69

4

3.2

6.4


WP

AGBRC1765

252589

674405

91

99

8

6.4

1.6

120

including



92

93

1

0.8

9.6


AGBRC1777

252591

674513

18

27

9

7.2

2.9

84

including



18

20

2

1.6

10.2


AGBRC1778

252633

674487

66

75

9

7.2

2.2

102

including



69

72

3

2.4

5.6


AGBRC1780

252623

674415

100

109

9

7.2

3.0

126

including



101

102

1

0.8

13.7


AGBRC1796

252988

674677

24

31

7

5.6

3.5

80

including



24

25

1

0.8

8.2


AGBRC1797

253012

674665

28

45

17

13.6

1.7

96

including



40

42

2

1.6

6.7


P2

AGBRC1804

253008

673699

47

53

6

4.8

3.5

100

including



48

50

2

1.6

7.7


AGBRC1805

253056

673675

70

75

5

4.0

3.4

126

including



72

74

2

1.6

7.5


AGBRC1837

252963

673680

1

78

77

Unknown

8.6

86

including



53

58

5

Unknown

22.1


AGBRC1850

253216

673905

11

17

6

4.8

4.4

56

including



12

13

1

0.8

11.4


AGBRC1852

253011

673653

76

90

14

11.2

3.0

108

including



79

80

1

0.8

10.0


AGBRC1853

253033

673640

115

120

5

4.0

3.4

140

including



116

117

1

0.8

7.6


AGBRC1854

252918

673712

0

27

27

Unknown

7.2

90

including



9

13

4

Unknown

34.7


P4

AGBRC1791

252798

675015

0

13

13

10.4

2.9

84

including



8

12

4

3.2

6.4


and



68

74

6

4.8

7.5


including



72

73

1

0.8

13.4


AGBRC1792

252834

674995

39

46

7

5.6

2.0

84

including



44

45

1

0.8

4.6


and



77

*84

7

5.6

32.5


including



79

80

1

0.8

177.4


AGBRC1793

252870

674975

33

38

5

4.0

3.0

84

including



36

37

1

0.8

8.8


and



71

81

10

8.0

4.4


including



74

78

4

3.2

10.4


AGBRC1794

252902

674957

46

53

7

5.6

6.3

105

including



47

49

2

1.6

9.0


AGBRC1815

252845

675199

5

10

5

4.0

2.3

54

including



7

8

1

0.8

8.7


AGBRC1891

252938

674936

51

60

9

7.2

4.2

79

including



51

54

3

2.4

11.9


and



64

72

8

6.4

2.7


including



64

66

2

1.6

9.5


AGBRC1892

252733

675008

65

71

6

4.8

3.3

114

including



66

67

1

0.8

5.6


AGBRC1893

252765

674991

74

85

11

8.8

3.7

96

including



74

78

4

3.2

7.1


AGBRC1894

252797

674972

52

58

6

4.8

4.6

102

including



53

55

2

1.6

12.1


and



81

90

9

7.2

4.2


including



86

87

1

0.8

19.8


AGBRC1895

252836

674951

87

98

11

8.8

8.2

102

including



88

89

1

0.8

21.1


P6

AGBRC1781

253325

674923

78

90

12

9.6

4.4

138

including



80

88

8

6.4

5.9


AGBRC1786

253251

674943

12

29

17

13.6

3.3

102

including



21

23

2

1.6

15.1


AGBRC1787

253300

674916

68

80

12

9.6

4.0

124

including



69

73

4

3.2

6.4


and



75

77

2

1.6

6.9


AGBRC1828

253429

675253

57

69

12

9.6

1.3

102

including



66

68

2

1.6

4.1


AGBRC1806

253416

675027

48

54

6

4.8

3.3

78

including



48

49

1

0.8

8.7


AGBRC1816

253175

674792

39

52

13

10.4

2.0

110

including



49

51

2

1.6

7.2


AGBRC1825

253393

675233

40

47

7

5.6

2.7

78

including



42

43

1

0.8

6.4


and



69

75

6

4.8

5.1


including



69

72

3

2.4

9.1


AGBRC1826

253433

675208

71

91

20

16.0

1.3

96

including



71

72

1

0.8

6.5


AGBRC1830

253327

674901

30

44

14

11.2

2.6

158

including



38

39

1

0.8

11.3


and



105

111

6

4.8

4.1


including



109

110

1

0.8

7.6


AGBRC1834

253430

674939

77

84

7

5.6

2.2

108

including



78

79

1

0.8

12.8


AGBRC1843

253432

675296

32

51

19

15.2

4.8

102

including



40

42

2

1.6

14.8


AGBRC1868

253236

674895

44

51

7

5.6

3.1

114

including



45

48

3

2.4

5.8


AGBRC1869

253265

674881

71

79

8

6.4

4.6

132

including



71

76

5

4.0

7.1


P7

AGBRC1855

253185

673625

14

21

7

5.6

3.4

102

including



16

19

3

2.4

5.3


AGBRC1856

253234

673641

114

118

4

3.2

5.0

180

including



116

117

1

0.8

13.9


and



164

177

13

10.4

1.6

180

including



171

173

2

1.6

6.4


AGBRC1859

253237

673686

16

25

9

7.2

2.8

54

including



22

24

2

1.6

7.0


*Intercept continues to the End of Hole

SOURCE Endeavour Mining Corporation



Contact
Doug Reddy, SVP Business Development, +1 604 609 6114, dreddy@endeavourmining.com; UK/Europe: Bobby Morse, Buchanan, +44 20 7466 5000 bobbym@buchanan.uk.com
 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz