Lion One Metals Ltd. announces that the Government of Fiji has granted an extension of the Tuvatu Mining Lease for an additional 10 year term renewable on Feb. 28, 2035. SML 62 is the Company's cornerstone permit enabling Lion One to build mining and milling operations at Tuvatu, forming part of its 100% owned, high-grade Tuvatu Alkaline Gold Project, located 24km from Fiji's International Airport in Nadi. In an official [...]
Lion One Metals Ltd. is delighted to announce the discovery of a major new feeder structure at its Tuvatu Alkaline Gold Project in Fiji. Hole TUG-141, targeting a complex network of high-grade structures called the 500 Zone, has encountered the longest high-grade intercept yet recorded at Tuvatu, 20.86 g/t Au over 75.9m, including 43.62 g/t Au over 30.0m which includes 90.35 g/t Au over 7.2m. The new discovery is located [...]
Lion One Metals Ltd. is pleased to announce results from ongoing infill drilling at its Tuvatu Alkaline Gold Project in Fiji. Results for the first 11 holes of Lion One's Phase 2 infill program on Zone 5 of their fully permitted Tuvatu alkaline gold deposit are here reported. The results to date indicate significant new intercepts of high- to bonanza-grade Au mineralization that was not known to occur as part of the [...]
Lion One Metals Ltd. is pleased to report that ongoing drilling has returned multiple high grade intercepts, significantly extended the drill-confirmed vertical extent of Deep Feeder Zone 500, and further confirmed the alkaline deposit model and depth potential of the Tuvatu Alkaline Gold Project in Fiji. Extending Deep Feeder Zone 500 The latest drilling at Tuvatu extends Deep Feeder Zone 500 approximately 300 meters [...]
Lion One Metals Ltd. is pleased to announce plans to expand its drilling and sampling capacity through the purchase of two additional drill rigs and expansion of its laboratory serving the Company's fully permitted high grade Tuvatu Alkaline Gold Project in Fiji. 8 12,000 SAMPLES PER MONTH Lion One's Senior Vice-President Exploration Sergio Cattalani commented, "Our best performing rigs have been two Canadian-made rigs [...]
Lion One Metals Ltd. is very pleased to announce additional results from its recently completed Phase 1 infill drill program on the Zone 2 portion of the Tuvatu high-grade alkaline Au deposit located on the island of Viti Levu in Fiji. The infill program began in June, 2021 and was completed last week with the termination of hole TUDDH576, bringing the total drilled to 7475.2m and total drill core resampled to 955.4m, for [...]
Lion One Metals Ltd. is pleased to provide the following progress report for the engineering and development of the Company's fully permitted high grade Tuvatu Alkaline Gold Project located on the island of Viti Levu in Fiji. Highlights Production permits are in place for underground gold mining operations Engineering and procurement of gold recovery plant is underway Development of second underground access portal is [...]
Lion One Metals Ltd. is pleased to announce additional results from the infill drill program undertaken in the near-surface portion of the Tuvatu deposit. This program was designed to further strengthen the database in the portion of the deposit earmarked for earliest production, from the Company's 100% owned Tuvatu alkaline gold project in Fiji. ~6735m of drilling completed in 38 holes since the start of infill program [...]
Lion One Metals Ltd. is pleased to announce the results of its Annual General Meeting , held on December 16, 2021. According to the meeting Scrutineers report, 128 shareholders were represented at the meeting, in person or by proxy, representing 39,544,470 common shares or 25.29% of the 156,371,893 common shares outstanding on the October 27, 2021 record date for the Meeting. All resolutions presented to the shareholders [...]
Lion One Metals Ltd. is pleased to announce results from the infill drill and re-sampling program undertaken in the near-surface portion of the Tuvatu deposit. This program was designed to further strengthen the database in the portion of the deposit earmarked for earliest production, from the Company's 100% owned Tuvatu gold project in Fiji. 5,615m of infill drilling completed in 30 holes 600 additional data points [...]
Lion One Metals Ltd. is pleased to announce further high-grade intercepts from two recently completed drillholes as part of ongoing deep extensional step-out drilling from the Company's 100% owned Tuvatu gold project in Fiji. - DEEP FEEDER ZONE 500 NOW EXTENDS OVER 300M VERTICALLY AND 150M LATERALLY - WEIGHTED AVERAGE GRADE OF 23 G/T Au FROM ZONE 500 MINERALIZED INTERCEPTS 2.6 X - ZONE 500 470M DEPTH - 53% TO APPROX [...]
Lion One Metals Ltd. is pleased to announce further high grade intercepts from ongoing deep extensional step-out drilling and near-surface infill drilling from the Company's 100% owned Tuvatu gold project in Fiji. Highlights include: 10.24 g/t Au over 8.48m from downhole depth of 111.20m from TUDDH539 -incl. 33.26 g/t Au over 2.44m from 111.20m, and 13.49 g/t Au over 3.30m from 115.40m 24.92 g/t Au over 3.70m from [...]