Continued high-grade intercepts including 18m at 1.0% Cu eq, 6m at 2.44% Cu eq, 10.6m at 1.55% Cu eq and 10.35m at 1.23% Cu eq Exceptionally high-grade massive sulfide with up to 17.05% Cu, 0.16% Co, 42.7g/t Ag, 0.22g/t Au over 0.43m Thick copper, tin, silver intervals to within 0.5m from surface, including 67.5m at 0.54% Cu eq and 50.1m at 0.50% Cu eq extending the open pit target which remains open in several directions [...]
Pan Global Resources Inc. is deeply saddened to announce that after a short illness Bob Baxter has passed away at the age of 60. "We are deeply saddened by the passing of our dear friend and colleague," said Tim Moody, President and CEO. "Bob was one of the finest geologists I've had the privilege to work with. He was energetic, smart and always filled the room with his joyous laughter. He will be deeply missed by all who [...]
4,500m drill program targeting extensions of the high-grade mineralization in all directions at the La Romana copper prospect Highlights: Drilling has resumed at the company's La Romana target 20 drill holes for 4,500m are planned aimed at extending the copper mineralization in all directions, including extending the near surface copper mineralization in the west and extensions of the high-grade massive chalcopyrite in [...]
Strong copper mineralization in all three drill holes; One of the best holes to date from Hole LRD20 returning 26.5m at 1.29% Cu equivalent, including 11m at 2.31% Cu equivalent from near surface in the west; Hole LRD19 returning 15m at 1.44% Cu equivalent, including 1.75m at 6.41% Cu equivalent extending the high-grade zone in the east Pan Global Resources Inc. is pleased to report excellent results for an additional [...]
New drill hole intersects 24.4m at 1.03% Cu equivalent, including 7.2m at 2.05% Cu equivalent and confirms continuity of the high-grade mineralization Pan Global Resources Inc. is pleased to report excellent results for an additional three drill holes from the Phase 3 drill program at the La Romana target, in the Escacena Project. Results are pending for a further eight drill holes and five additional holes will test new [...]
HIGHLIGHTS INCLUDE: New geophysics survey shows excellent continuity and potential increase in thickness up-dip of exceptionally high grade massive chalcopyrite drill intersections Phase 3 drill program expanded Gravity survey underway Pan Global Resources Inc. is pleased to report very encouraging results from a new mise à la masse geophysics survey at the La Romana target in the Escacena Project. The MALM survey shows [...]
HIGHLIGHTS INCLUDE: Massive chalcopyrite in consecutive drill holes with exceptionally high grades of 15.1% Cu / 16.5% Cu equivalent which remains wide open Near surface copper, tin, silver mineralization extended to the West New IP results significantly expand the La Romana target from the recent exceptional high grade drill results to the East Pan Global Resources Inc. is pleased to report positive results for all seven [...]
Pan Global Resources Inc. is pleased to report completion of the transfer of Investigation Permit "Escacena" number 14,903 from Evalam 2003 S.L. to the Company's Spanish subsidiary, Minera Escacena, S.L. The Escacena Investigation Permit is part of the Escacena Project area, in the Iberian Pyrite Belt, southern Spain. Tim Moody, President and CEO of Pan Global commented: "The early transfer of title for the Escacena [...]
DHEM Survey Significantly Extends Copper Target Pan Global Resources Inc. is pleased to report that new down hole electromagnetic survey results have significantly expanded the lower conductor anomaly associated with recently intersected massive chalcopyrite mineralization. Based on these results, Pan Global is mobilizing a second drill rig to accelerate the ongoing Phase 3 drill program at the La Romana copper discovery [...]
Pan Global Resources Inc. is pleased to report the ongoing Phase 3 drill program is continuing to intersect copper mineralization at the La Romana copper target in the Escacena Project, Iberian Pyrite Belt, southern Spain. As reported in the Press Release of September 8, 2020, the first five drill holes of the current program all returned visual copper mineralization. Of significance, the next two recently completed drill [...]
Visual Copper Mineralization in All Holes Completed to Date Pan Global Resources Inc. is pleased to report good progress on the phase 3 step-out drilling program in progress at the La Romana copper target in the Escacena Project, southern Spain. The first five drill holes of this program have been completed with copper mineralization intersected in each hole. Tim Moody, President and CEO of Pan Global commented, "We are [...]
Phase 3 drill program commenced at La Romana Up to 25 drill holes, approximately 3,500 meters, to significantly expand the copper mineralization Fully funded for expanded drill program Pan Global Resources Inc. is pleased to announce follow-up drilling has now commenced at the La Romana copper target in the Escacena Project, Iberian Pyrite Belt, southern Spain. Tim Moody, President and CEO of Pan Global commented: "We are [...]