NWM Mining is pleased to announce additional Reverse-Circulation (RC) drilling results from the RC drilling program recently completed at Lluvia de Oro. The Company has received and reviewed the results of an additional 17 drill holes completed at Lluvia de Oro since the drill results reported December 1, 2010. This new drill data includes RC holes [...]
NWM Mining Corporation[/wp] (TSX-V: NWM) is pleased to announce the engagement of R. Bruce Thorndycraft for the position of Chief Operating Officer of the Lluvia de Oro and La Jojoba gold mine. Bruce holds a BS in Chemical Engineering and a Masters in Metallurgical Engineering. Bruce is fluent in Spanish and has more than thirty five years of [...]
NWM Mining is pleased to announce the closing of a 30,000,000 common share private placement financing. Each share was issued at a price of $.10 cents per common share for aggregate proceeds of CAD $3,000,000. Commissions amounting to CAD $192,500 were paid, and shares totalling 1,925,000 issued, to placement agents in connection with this [...]
NWM Mining is pleased to announce additional drilling results from the on-going 2010 drilling program at the Company's wholly owned Lluvia-Jojoba project, located in northern Sonora, Mexico. The Company has received and reviewed the results of an additional 27 core drill holes completed at Lluvia de Oro since the drill results reported July 20 [...]
NWM Mining is pleased to announce results received from the use of Selective Mining at the Lluvia de Oro mine. Selective Mining focuses on the elimination of waste by utilizing closely spaced blast hole drilling with smaller, more flexible mining equipment.