Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
SSR Mining Inc.
SSR Mining Inc.
Registriert in: Kanada WKN: A2DVLE Rohstoffe:
Art: Originalaktie ISIN: CA7847301032 Gold
Silber
Kupfer
Blei
Zink
Heimatbörse: TSX Alternativ: SSRM
Währung: CAD    
Symbol: SSRM.TO Forum: GoldSeiten-Forum.de

Silver Standard Resources Inc.: Pitarrilla Project and Resource Update

27.02.2012 | 13:00 Uhr | Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/27/12 -- Silver Standard Resources Inc. (TSX: SSO)(NASDAQ: SSRI) ('Silver Standard' or the 'Company') announced today an update for the Pitarrilla project in Durango, Mexico ('Pitarrilla'), including an updated mineral resources estimate for oxide and sulphide mineralization.



Highlights

-- Contracted M3 Engineering to complete the Pitarrilla feasibility study.
M3 has designed and built many mines in Mexico, including the Penasquito
mine.
-- Feasibility study on track for mid-year 2012 completion.
-- Construction permit application on track for second-half 2012
submission.
-- Feasibility design is being based on an open-pit mine and a 16,000 tonne
per day plant with an agitated leach circuit producing a silver dore and
a flotation circuit producing separate zinc and lead concentrates
containing payable silver.
-- Hired experienced project manager and key development and construction
management personnel.
-- Measured and Indicated mineral resources estimate of 655.7 million
ounces of contained silver (at a 30 g/t silver cut-off grade).
-- Inferred mineral resources estimate of 65.0 million ounces of contained
silver (at a 30 g/t silver cut-off grade).


'Pitarrilla's mineral resources are significant and drive the potential for a long-life mine with strong annual silver production,' said John Smith, President and CEO. 'Our team has now settled on an open-pit design concept to optimize a larger amount of silver for the long-term benefit of our shareholders and stakeholders. This approach is consistent with our positive outlook on silver and our strategy of driving growth and value from our extensive 100% owned asset portfolio.'


The Pitarrilla feasibility study is being prepared by M3 Engineering & Technology Corporation and the Company's development team, and will build on previous resource engineering and design work. This Pitarrilla feasibility study will focus on mining oxide and sulphide ores from one large open-pit operation. Plant facilities are expected to target 16,000 tonnes per day and include a milling circuit, an agitated leach circuit and a flotation circuit. These facilities are expected to produce silver dore, and separate zinc and lead concentrates containing payable silver. Completion of the Pitarrilla feasibility study is scheduled for mid-year 2012.


A diamond drill program of approximately 8,300 meters is scheduled for 2012, with the objective of expanding the near-surface oxide mineralization at the Breccia Ridge and South Ridge zones. In addition, metallurgical testing is underway to optimize metal recoveries from oxide and sulphide mineralization. Where possible, results of this year's drilling and metallurgical studies will be included in the Pitarrilla feasibility study.


The January 31, 2012, Pitarrilla mineral resources estimate was prepared, verified and approved by the Company's qualified person Dr. Warwick Board, Ph.D., Senior Geologist with Silver Standard. The estimate is presented at three different silver cut-off grades in Table 1, shown below. These mineral resources estimates are not materially different from those previously published. A new mineral reserve estimate will be prepared as part of the Pitarrilla feasibility study. This new mineral reserve estimate will utilize the open-pit mine concept whereas the current mineral reserve estimate utilizes an underground mine concept.



Table 1: Pitarrilla Mineral Resources Estimate
(effective as of January 31, 2012)

---------------------------------------------------------------------------
Silver
Cut-off Silver Lead Zinc Contained Contained Contained
Classifi- Grade Tonnage Grade Grade Grade Silver Lead Zinc
cation (g/t) (Mt) (g/t) (%) (%) (Moz) (Mlbs) (Mlbs)
---------------------------------------------------------------------------
20 25.3 81.3 0.63 1.09 66.1 352 610
----------------------------------------------------------------
Measured 30 23.0 86.7 0.67 1.14 64.2 340 580
----------------------------------------------------------------
40 19.7 95.6 0.73 1.22 60.4 315 528
---------------------------------------------------------------------------
20 238.5 78.9 0.31 0.72 605.2 1,605 3,787
----------------------------------------------------------------
Indicated 30 222.0 82.9 0.31 0.73 591.5 1,525 3,581
----------------------------------------------------------------
40 192.4 90.2 0.33 0.76 558.0 1,379 3,220
---------------------------------------------------------------------------
Total 20 263.8 79.2 0.34 0.76 671.3 1,957 4,396
Measured ----------------------------------------------------------------
and 30 245.0 83.3 0.35 0.77 655.7 1,864 4,162
Indicated ----------------------------------------------------------------
40 212.0 90.7 0.36 0.80 618.4 1,694 3,748
---------------------------------------------------------------------------
20 34.7 60.8 0.18 0.44 67.9 139 338
----------------------------------------------------------------
Inferred 30 31.3 64.7 0.18 0.44 65.0 124 301
----------------------------------------------------------------
40 25.0 72.1 0.19 0.46 57.8 103 255
---------------------------------------------------------------------------

Notes to Table 1:

1. Dr. Warwick Board, Ph.D. (Geology), P.Geo., is the Qualified Person for
the reported mineral resources estimate.
2. All mineral resources have been classified in accordance with current
CIM definition standards.
3. The Ordinary Kriging with appropriate top-cuts modeling methodology was
employed for the mineral resources estimates presented in the above
table.
4. Although a silver cut-off grade of 30 g/t Ag is considered at this time
to be the most likely economic cut-off grade for large-scale open-pit
mining of the Pitarrilla deposit, it has not yet been confirmed by the
appropriate mining studies. A detailed economic cut-off grade analysis
will be conducted as part of the Pitarrilla feasibility study.
5. Silver capping grades used in the estimation range between 415 g/t Ag
and 1,825 g/t Ag for the various oxide domains, and between uncapped to
1,370 g/t Ag for the various sulphide domains. Zinc capping grades used
in the estimation range between 0.55% Zn and 4.63% Zn for the various
oxide domains, and between uncapped and 10.00% Zn for the various
sulphide domains. Lead capping grades used in the estimation range
between uncapped and 4.02% Pb for the various oxide domains, and
between uncapped and 6.04% Pb for the various sulphide domains.
6. Detailed bulk density modeling was conducted taking into account
lithological variability (including an analysis of voids),
mineralization, and degree of oxidation.
7. The drillhole database including collar, survey, assay, lithology, and
mineralization, used in the preparation of the mineral resources
estimate in Table 1 was validated through conducting detailed
verification checks, including QA/QC of location and assay data.
8. Sums may not equal reported totals due to rounding.


SOURCE: Silver Standard Resources Inc.


Cautionary Statements on Forward-Looking Information: Statements in this news release are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and forward-looking information within Canadian securities laws (collectively 'forward-looking statements'), such as estimates of mineral resources and reserves and mineralization that will be encountered if and when a property is developed, design parameters and timing to complete the Pitarrilla feasibility study, and proposed drill program estimates. Forward-looking statements are statements that are not historical facts and that are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements and are often identified by such words as 'estimates', 'expects', 'plans', 'intends' or variations thereof, or stating that certain actions or results 'may', 'could', 'might' or 'will' be taken, occur or be achieved. Such risks and uncertainties include, but are not limited to risks relating to the interpretation of drill results and the geology, grade and continuity of our mineral deposits; technological and operational difficulties or the delay, non-compliance or inability to obtain permits encountered in connection with exploration and development activities; changes in economic conditions or financial markets; changes in prices for the Company's mineral products or increases in input costs; uncertainty of production and cost estimates for the Pirquitas Mine and the Pitarrilla project; risks and uncertainties associated with new mining operations including start-up delays and operational issues; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments in Argentina, Canada, Chile, Mexico, Peru, the United States and other jurisdictions in which Silver Standard may carry on business; labour relations matters; and changing foreign exchange rates, all of which are described more fully in the Company's most recent Form 20-F, and in the Management Discussion and Analysis and in other filings with the Securities and Exchange Commission and Canadian regulatory authorities.


This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and we do not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.


Cautionary Note to U.S. Investors


This news release uses the terms 'Measured Mineral Resource' and 'Indicated Mineral Resource'. We advise U.S. investors that while such terms are recognized and required under Canadian regulations, the SEC does not recognize them. U.S. investors are cautioned not to assume that any part or all of the Mineral Resources in these categories will ever be converted into Mineral Reserves.


This news release uses the term 'Inferred Mineral Resources'. We advise U.S. investors that while such term is recognized and required under Canadian regulations, the SEC does not recognize it. 'Inferred Mineral Resources' have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part or all of an Inferred Mineral Resource exists, or is economically or legally mineable.


To receive Silver Standard's news releases by e-mail, contact Investor Relations at invest@silverstandard.com or call (888) 338-0046.


The TSX has neither approved nor disapproved of the information contained herein.

Contacts:

Silver Standard Resources Inc.

Michael McDonald, Manager, Business Development

N.A. Toll Free: (888) 338-0046

All others: (604) 689-3846
invest@silverstandard.com
www.silverstandard.com


 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz