Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Discovery Reports 63,154 Ounces Of Gold Production, $86.8 Million Of Free Cash Flow(1) In Q3 2025

05:45 Uhr  |  GlobeNewswire

Cash of $341.5 million at September 30, 2025

  1. Example of Non-GAAP measure. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.
  2. Site-level AISC includes corporate G&A allocation and excludes remaining corporate G&A, share-based compensation costs and corporate-level sustaining capital expenditures.

TORONTO, Nov. 12, 2025 -- Discovery Silver Corp. (TSX: DSV, OTCQX: DSVSF) ("Discovery" or the "Company") today announced the Company's financial and operating results for the third quarter ("Q3 2025") and first nine months ("YTD 2025") of 2025. Discovery began reporting the results of gold production and sales following the Company's acquisition ("Acquisition" or "Porcupine Acquisition") of the Porcupine Complex ("Porcupine") in and near Timmins, Ontario on April 15, 2025. The Company's full financial statements and management discussion & analysis are available on SEDAR+ at www.sedarplus.ca and on the Company's website at www.discoverysilver.com. All dollar amounts are in US dollars, unless otherwise noted.

Tony Makuch, Discovery's CEO, commented: "During Q3 2025, we generated solid operating and financial results while at the same time continuing to integrate systems, align policies and procedures, strengthen management structures and advance investment programs at Porcupine. A key highlight of the third quarter was cash flow, with net cash from operating activities of $153.5 million and free cash flow1 totaling $86.8 million. Strong cash flow resulted from a 56% increase in gold sales, to 66,200 ounces from 42,550 ounces the previous quarter, and an increase in the average realized gold price1, to $3,489 per ounce sold. Driven by strong cash flow generation, we grew our cash position by 35%, to $341.5 million at September 30, 2025. With our current cash, as well as a new revolving credit facility for $250 million, plus a $100 million accordion feature, Discovery is very well capitalized as it moves forward with investment plans aimed at growing production, improving costs and maximizing value creation at Porcupine.

"A key component of the tremendous potential at Porcupine involves exploration. Last week, we issued our first exploration update, which included excellent drill results from resource conversion and expansion drilling at Hoyle Pond, Borden and Pamour, as well as very encouraging results at Owl Creek, which confirm the presence of high-grade mineralization three kilometers to the west of Hoyle Pond. We also announced the commencement of drilling programs at Dome Mine and the TVZ Zone. Dome and TVZ have the potential to become two new mining operations that could substantially grow production and value creation in Timmins. Drilling at Dome and TVZ is being conducted as part of studies to more thoroughly evaluate the projects, with these studies targeted for completion in 2026."

SUMMARY OF Q3 AND YTD 2025 PERFORMANCE

Three months ended Nine months ended
In $ thousands except per share amounts September 30,
2025
September 30,
2024
June 30,
2025
September 30,
2025
September 30,
2024
Revenue 236,961 - 142,010 378,971 -
Production costs 106,807 - 54,919 161,726 -
Earnings (loss) before income taxes 71,114 (3,860) 24,510 89,172 (9,503)
Net earnings (loss) 42,439 (3,860) 5,534 41,521 (9,503)
Basic earnings (loss) per share 0.05 (0.01) 0.01 0.06 (0.02)
Diluted earnings (loss) per share 0.05 (0.01) 0.01 0.06 (0.02)
Cash flow from (used in) operating activities 153,488 (1,192) 67,081 214,492 (12,206)
Cash investment on mine development and PPE (66,675) (2,280) (39,766) (110,208) (7,723)


Three months ended Nine months ended
September 30,
2025
September 30,
2024
June 30
2025
September 30,
2025
September 30,
2024
Tonnes milled 808,688 - 508,791 1,317,480 -
Average Grade (g/t Au) 2.69 - 3.39 2.96 -
Recovery (%) 90.3 - 91.3 90.7 -
Gold produced (oz) 63,154 - 50,552 113,706 -
Gold sold (oz) 66,200 - 42,550 108,750 -
Average realized price ($/oz sold)(1) $ 3,489 $ - $ 3,337 $ 3,430 $ -
Operating cash costs per ounce sold ($/oz sold)(1)(2) $ 1,339 $ - $ 1,341 $ 1,340 $ -
AISC per ounce sold ($/oz sold)(1)(2)(3) $ 1,734 $ - $ 2,074 $ 1,863 $ -
Adjusted net earnings(1) $ 61,090 $ (2,336 ) $ 28,434 $ 86,479 $ (6,414 )
Adjusted net earnings per share(1) $ 0.08 $ (0.01 ) $ 0.04 $ 0.13 $ (0.02 )
Free cash flow(1) $ 86,813 $ (3,472 ) $ 27,315 $ 104,284 $ (19,929 )

(1) Example of Non-GAAP measure. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.
(2) For Q2 2025, ounces sold and the cash payments in the operating cash costs per ounce sold and AISC per ounce sold calculations that related to the Franco Royalty arrangement have been excluded. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.
(3) YTD 2025 results exclude G&A expense, share-based compensation costs and sustaining capital expenditures and lease expense incurred prior to April 15, 2025, the completion date of the Porcupine Acquisition.

Q3 2025

(1) Represents cash capital expenditures incurred during Q3 2025

YTD 2025

Discovery did not generate revenue or earnings from mine operations in YTD 2024 or Q1 2025.

(1) Example of Non-GAAP measure. See the section of this press release entitled, "NON-GAAP MEASURES" for more information.
(2) Refers to earnings before interest, taxes and depreciation and amortization.

Income Statement Summary

Three months ended Nine months ended
September 30,
2025
September 30,
2024
June 30,
2025
September 30
2025
September 30,
2024
Revenue $ 236,961 $ - $ 142,010 $ 378,971 $ -
Production costs 106,807 - 54,919 161,726 -
Depreciation and amortization 35,826 - 16,384 52,210 -
Royalties 3,619 - 1,916 5,535 -
Earnings from mining operations 90,709 - 68,791 159,500 -
Expenses
General and administration 6,661 2,017 22,877 35,012 5,658
Exploration 5,972 158 830 6,827 375
Impairment 2,140 - - 2,140 -
Share-based compensation 1,398 676 1,953 4,518 2,022
Earnings from operations 74,538 (2,851 ) 43,131 111,003 (8,055 )
Other
Other income (loss) 9,301 (1,327 ) (6,879 ) 2,611 (2,778 )
Finance Items
Finance expense, net (12,725 ) 318 (11,742 ) (24,442 ) 1,330
Earnings before taxes 71,114 (3,860 ) 24,510 89,172 (9,503 )
Income taxes expense 28,675 - 18,976 47,651 -
Net (loss) earnings $ 42,439 $ (3,860 ) $ 5,534 $ 41,521 $ (9,503 )
Basic earnings per share $ 0.05 $ (0.01 ) $ 0.01 $ 0.06 $ (0.02 )
Diluted earnings per share $ 0.05 $ (0.01 ) $ 0.01 $ 0.06 $ (0.02 )
Weighted average number of common shares outstanding (in 000's)
Basic 802,837 397,696 735,616 647,997 399,538
Diluted 825,798 397,696 762,923 670,958 399,538


PORCUPINE OPERATIONS REVIEW

Discovery's Porcupine Operations cover approximately 1,400 km2 in and near Timmins, Ontario. Porcupine consists of the Hoyle Pond, Pamour and Hollinger mine properties, the Dome mine property and milling facility, and numerous near-mine and regional exploration targets. The Complex also includes the Borden mine property and large land position near Chapleau, Ontario. Current operations include the Hoyle Pond and Borden underground mines, with the Pamour open-pit project currently ramping up towards commercial levels of production. All mineralization is processed at the Dome, including mineralization from Borden, which is trucked 190 km to the mill. The Dome Mill is a 12,000 tonne-per-day processing facility that in recent years has operated at rates well below optimal levels. Through investment programs launched following the closing of the Porcupine Acquisition, the Company is targeting a return to full capacity operations by 2028 or sooner.

Three months ended Nine months ended
Porcupine Complex September 30,
2025
June 30,
2025
September 30,
2025
Ore processed (t) 808,688 508,791 1,317,480
Average Grade (g/t Au) 2.69 3.39 2.96
Recovery (%) 90.3% 91.3% 90.7%
Gold produced (oz)1 63,154 50,552 113,706
Gold poured (oz)1 65,978 46,608 112,586
Gold sold (oz)1 66,200 42,550 108,750
Milling operating costs ($ Millions) $ 17,107 $ 12,861 $ 29,968
Operating costs per tonne processed ($/tonne) $ 21.2 $ 25.4 $ 22.7
Production costs 106,807 54,919 161,726
Operating cash costs per ounce sold2,3 1,339 1,341 1,340
AISC per ounce sold2,3 1,699 1,849 1,756
Total capital expenditures2,3(in thousands) 65,976 41,632 107,608

(1) Includes gold production, poured and sold from Hoyle Pond, Borden and Pamour.
(2) Example of Non-GAAP measure. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.
(3) Operating cash costs per ounce sold, AISC per ounce sold and total capital expenditures are site level and exclude remaining corporate G&A, share-based compensation costs and corporate-level sustaining capital expenditures.

During Q3 2025, a total of 808,688 tonnes were processed at Porcupine Complex at an average grade of 2.69 g/t, with recovery rates averaging 90.3%, which compared to 508,791 tonnes at an average grade of 3.39 g/t and recovery rates averaging 91.3% for the 76 days from April 16, 2025 to June 30, 2025 in Q2 2025. A total of 63,154 ounces of gold were produced over this period, with total gold poured of 65,978 ounces, compared to 50,552 and 46,608 ounces produced and poured respectively, in the previous quarter. Higher production in Q3 2025 mainly reflected the favourable impact of increased mining rates and higher average grades at both Borden and Pamour, partially offset by a reduction in mining rates and average grades at Hoyle Pond. During Q3 2025, production at Hoyle Pond was impacted by ventilation constraints during a period of high temperatures, which limited access to higher-grade area of the S Zone Deep.

Availability rates at the Dome Mill during Q3 2025 were impacted by a scheduled five-day maintenance shutdown in July for the purpose of replacing the discharge head and shell of B Rod Mill, rebuild of the tertiary crusher, and feeder repairs at the coarse ore stockpile. The Company used the occasion of the shutdown to advance multiple other projects, primarily in the grinding water system, repair to the mill reclaim water pond and carbon handling circuits. Based on operating days during Q3 2025, mill throughput averaged approximately 9,295 tonnes per day. Mill operating costs during Q3 2025 totaled $17.1 million for an average of $21.15 per tonne processed, which compared to $12.9 million and an average of $25.4 per tonne, respectively, the previous quarter, with the improvement in operating costs per tonne resulting from the 59% increase in tonnes processed. Mill costs are allocated to the mine operations based on a proportion of total tonnes processed.

For YTD 2025 a total of 1,317,480 tonnes were processed at Dome Mill at an average grade of 2.96 g/t, with recovery rates averaging 90.7%. A total of 113,706 ounces of gold were produced over this period, with total gold poured of 112,586 ounces. Total mill operating costs were $30.0 million for YTD 2025, for an average of $22.75 per tonne processed. The mill costs are allocated to the mine operations based on a proportion of total tonnes processed.

Production costs, including mining and processing costs, in Q3 2025 totaled $106.8 million versus $54.9 million in the previous quarter. Operating cash costs1 averaged $1,339 compared to $1,341 in the previous quarter. Site-level AISC1,2 averaged $1,699 per ounce sold compared to $1,849 in Q2 2025. Included in Q3 2025 AISC was $22.1 million of sustaining capital expenditures1, mainly related to capital development activities and capital expenditures related to the TMA6, which increased from $14.8 million in Q2 2025. The improvement in AISC was due to a 63% increase in ounces of gold sold, lower accretion and amortization of site closure provisions, partially offset by higher sustaining capital expenditures.
For YTD 2025, production costs totaled $161.7 million, with operating cash costs averaging $1,340 per ounce sold and AISC averaging $1,756 per ounce sold. Included in AISC were $36.8 million of sustaining capital expenditures related to capital development and expenditures related to the TMA6.

(1) Example of Non-GAAP measure. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.
(2) Site-level AISC includes corporate G&A allocation and excludes remaining G&A, share-based compensation costs and corporate-level sustaining capital expenditures.

CORDERO OVERVIEW

The Cordero Project was acquired by Discovery in 2019. Since that time, the Company has invested over $100.0 million in Mexico, conducting significant exploration drilling and technical analysis, leading to the release of multiple studies, most recently the feasibility study ("FS") dated February 16, 2024 and filed on SEDAR+ (www.sedarplus.ca) on March 28, 2024. The results of the FS confirmed Cordero to be one of the world's largest undeveloped silver deposits, with the potential for large-scale production at low unit costs and that is capable of generating substantial free cash flow and attractive economic returns.

Key highlights of the FS include:

Third Quarter 2025 Highlights

During Q3 2025, Discovery continued work on key initiatives to further de-risk the project, including:

(1) AgEq produced is metal recovered in concentrate. AgEq is calculated as Ag + (Au x 72.7) + (Pb x 45.5) + (Zn x 54.6); these factors are based on metal prices of Ag - $22/oz, Au - $1,600/oz, PB - $1,00/lb and Zn - $1.20/lb (2) use in the February 2024 FS.

Example of Non-GAAP measure. See the section in this press release entitled, "NON-GAAP MEASURES" for more information.

OUTLOOK

With the closing of the Porcupine Acquisition on April 15, 2025, Discovery was transformed into a diversified North American-focused precious metals producer combining growing gold production in Northern Ontario, Canada, with one of the world's largest silver development projects in Chihuahua State, Mexico.

Key priorities for the Porcupine Operations in 2025 continue to include:

The Company is currently executing a 140,000-metre drill program, which is expected to be completed early in 2026. The goals for the drilling program include resource conversion and expansion at Hoyle Pond, Borden and Pamour, in support of an updated technical report, to be issued in 2026, as well as the evaluation of district level targets, including Owl Creek, located approximately three kilometers west of Hoyle Pond. In addition, drilling is also being conducted at both Dome Mine and the TVZ Zone as part of studies to further advance and evaluate these high-potential targets.

With $341.5 million of cash at September 30, 2025, and the $250 million RCF, the Company is well capitalized to fund growth and optimization plans for Porcupine and current expenditure plans at Cordero.

In Mexico, the Company plans to further advance and de-risk the Cordero project, with key areas of focus being power, water availability and management, permitting, and the continuation of ESG and community outreach programs.

Following the completion of the land acquisition program in March 2025, the next major milestone for Cordero will be approval of the Company's Environmental Impact Assessment or MIA by SEMARNAT, which was submitted in August 2023. The MIA passed SEMARNAT's legal review soon after its submission and was advanced for technical review. As of the date of this press release, the Company had completed the technical review process and was awaiting approval of the MIA. The Company remains confident that Cordero will receive MIA approval.

ABOUT DISCOVERY

Discovery is a growing North American-focused precious metals company. The Company has exposure to silver through its first asset, the 100%-owned Cordero project, one of the world's largest undeveloped silver deposits, which is located close to infrastructure in a prolific mining belt in Chihuahua State, Mexico. On April 15, 2025, Discovery completed the acquisition of the Porcupine Complex from Newmont Corp., transforming the Company into a new Canadian gold producer with multiple operations in one of the world's most renowned gold camps in and near Timmins, Ontario. Discovery owns a dominant land position within the camp, with a large base of Mineral Resources remaining and substantial growth and exploration upside.

On Behalf of the Board of Directors,

Tony Makuch, P.Eng
President, CEO & Director

For further information contact:

Mark Utting, CFA
SVP Investor Relations
Phone: 416-806-6298
Email: mark.utting@discoverysilver.com
Website: www.discoverysilver.com

QUALIFIED PERSON

The scientific and technical information in this press release was reviewed and approved by Pierre Rocque, P.Eng., Chief Operating Officer of the Company and Eric Kallio, P.Geo., Senior Vice President, Exploration of the Company, who are recognized as a Qualified Persons ("QPs") under the guidelines of National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Scientific and technical information in this press release with respect to the Company's Cordero project has been prepared and presented based on the technical report entitled "Cordero Silver Project, Technical Report and Feasibility Study" with an effective date of February 16, 2024, as filed on SEDAR+ (the "Feasibility Study") which was completed by Ausenco Engineering Canada ULC, with support of AGP Mining Consultants Inc., WSP USA Inc. and RedDot3D Inc. The mineral reserve estimate was completed under the supervision of Wille Hamilton, P.Eng. Of AGP and the mineral resource estimate was completed under the supervision of R. Mohan Srivastava, P.Geo, both of whom are independent QPs as such term is defined in NI 43-101.

NON-GAAP MEASURES

The Company has included certain non-GAAP measures in this document, as detailed below. In the mining industry, these are common performance measures and ratios but may not be comparable to similar measures or ratios presented by other issuers and the non-GAAP measures and ratios do not have any standardized meaning. Accordingly, these measures and ratios are included to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers.

Free Cash Flow

Free Cash Flow is a non-GAAP performance measure that is calculated as cash flows from operations net of cash flows invested in mineral property, plant, and equipment and exploration and evaluation assets. The Company believes that this measure is useful to the external users in assessing the Company's ability to generate cash flow after capital investments and build the cash resources of the Company.

Free cash flow is reconciled to the amounts include in the Consolidated Statements of Cash Flows as follows:

Three months ended Nine months ended
Sept. 30,
2025
Sept. 30,
2024
June 30,
2025
Sept. 30,
2025
Sept. 30,
2024
$ Thousands
Net cash provided by operating activities $ 153,488 $ (1,192 ) $ 67,081 $ 214,492 $ (12,206 )
Mineral interests and PPE additions (66,675 ) (2,280 ) (39,766 ) (110,208 ) (7,723 )
Free cash flow $ 86,813 $ (3,472 ) $ 27,315 $ 104,284 $ (19,929 )


Sustaining and Growth Capital

Sustaining capital and growth capital are non-GAAP measures. Sustaining capital is defined as capital required to maintain current operations at existing levels. Growth capital is defined as capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations. Both measurements are used by management to assess the effectiveness of investment programs.

Three months ended Nine months ended
Sept. 30, Sept. 30, June 30 Sept. 30 Sept. 30,
$ Thousands 2025 2024 2025 2025 2024
Sustaining capital $ 20,799 $ - $ 66,122 $ 36,957 $ -
Growth capital 44,351 2,416 28,053 75,495 7,979
Finance leases related to IFRS 16 1,413 - 36 2,184 -
Total capital expenditures $ 66,563 $ 2,416 $ 44,211 $ 114,636 $ 7,979


Operating Cash Costs and Operating Cash Costs per Ounce Sold

Operating cash costs and operating cash costs per ounce sold are non-GAAP measures. In the gold mining industry, these metrics are common performance measures but do not have any standardized meaning under GAAP. Operating cash costs include mine site operating costs such as mining, processing, administration and royalty expenses but exclude depreciation and depletion and reclamation costs. Operating cash cost per ounce sold is based on ounces sold and is calculated by dividing operating cash costs by volume of gold ounces sold.

The Company discloses operating cash costs and operating cash cost per ounce sold as it believes the measures provide valuable assistance to investors and analysts in evaluating the Company's operational performance and ability to generate cash flow. The most directly comparable measure prepared in accordance with GAAP is production costs. Operating cash costs and operating cash costs per ounce sold should not be considered in isolation or as a substitute for measures prepared in accordance with GAAP.

AISC and AISC per Ounce Sold

AISC and AISC per ounce sold are non-GAAP measures. These measures are intended to assist readers in evaluating the total costs of producing and selling gold from current operations. While there is no standardized meaning across the industry for this measure, the Company's definition conforms to the definition of AISC as set out by the World Gold Council in its guidance note dated June 27, 2013.

The Company defines AISC as the sum of operating costs (as defined and calculated above), sustaining capital, exploration expense, corporate expenses, lease payments relating to sustaining assets, and reclamation cost accretion and depreciation related to current operations. Corporate expenses include general and administrative expenses, net of transaction related costs, severance expenses for management changes and interest income. AISC excludes growth capital expenditures, growth exploration expenditures, reclamation cost accretion and depreciation not related to current operations, lease payments related to non-sustaining assets, interest expense, debt repayment and taxes.

Operating cash costs and AISC Reconciliation

The following tables reconciles these non-GAAP measures to the most directly comparable GAAP measures for the three and nine months ended September 30, 2025, and the three months ended June 30, 2025.

Three months ended September 30, 2025
$ Thousands unless otherwise stated Porcupine Corporate Total
Consolidated
Production costs 106,807 - 106,807
Royalty expense 3,619 - 3,619
TSA1 (3,317) - (3,317)
PPA inventory2 (18,493) - (18,493)
Operating cash costs 88,616 - 88,616
General and administrative3 2,483 2,142 4,625
Share-based compensation - 1,398 1,398
Accretion of site closure provisions 1,303 - 1,303
Amortization of site closure provision (1,967) - (1,967)
Sustaining capital4 22,063 (1,264) 20,799
Expensed exploration - - -
Sustaining leases - 21 21
AISC 112,498 2,297 114,795
Ounces of gold sold 66,200 - 66,200
Operating cash costs per ounce sold ($) 1,339 - 1,339
Sustaining capital expenditures per ounce sold ($) 333 - 314
AISC per ounce sold ($) 1,699 - 1,734

(1) Costs not reflective of normal operations.
(2) Purchase price allocation represents the depletion of inventories acquired with the business combinations.
(3) Excludes certain items not reflective of normal operations.
(4) Includes the write-down of software.


Nine months ended September 30, 2025
$ Thousands unless otherwise stated Porcupine Corporate Total
Consolidated
Production costs 161,726 - 161,726
Royalty expense 5,535 - 5,535
TSA1 (5,733) - (5,733)
PPA inventory2 (18,493) - (18,493)
Operating cash costs 143,035 - 143,035
General and administrative3 2,483 7,974 10,457
Share-based compensation - 3,351 3,351
Accretion of site closure provisions 3,379 - 3,379
Amortization of site closure provision 1,096 - 1,096
Sustaining capital4 36,838 83 36,921
Expensed exploration 659 - 659
Sustaining leases - 42 42
AISC 187,490 11,450 198,940
Ounces of gold sold 106,766 - 106,766
Operating cash costs per ounce sold ($) 1,340 - 1,340
Sustaining capital expenditures per ounce sold ($) 345 - 346
AISC per ounce sold ($) 1,756 - 1,863

(1) Costs not reflective of normal operations.
(2) Purchase price allocation represents the depletion of inventories acquired with the business combinations.
(3) Excludes certain items not reflective of normal operations.
(4) Corporate includes the write-down of software.


Three months ended June 30, 2025
$ Thousands unless otherwise stated Porcupine Corporate Total
Consolidated
Production costs 54,919 - 54,919
Royalty expense 1,916 - 1,916
TSA1 (2,416) - (2,416)
PPA inventory - - -
Operating cash costs 54,419 - 54,419
General and administrative2 - 5,832 5,832
Share-based compensation - 1,953 1,953
Accretion of site closure provisions 2,076 - 2,076
Amortization of site closure provision 3,063 - 3,063
Sustaining capital 14,775 1,347 16,122
Expensed exploration 659 - 659
Sustaining leases - 21 21
AISC 74,992 9,153 84,145
Ounces of gold sold3 40,566 - 40,566
Operating cash costs per ounce sold ($) 1,341 - 1,341
Sustaining capital expenditures per ounce sold ($) 364 - 397
AISC per ounce sold ($) 1,849 - 2,074

(1) Costs not reflective of normal operations.
(2) Excludes certain items not reflective of normal operations.
(3) For Q2 2025, the ounces sold (1,984 ounces) and the cash payments ($6.6 million) in the operating cash costs per ounce sold and AISC per ounce sold calculations that related to the Franco Royalty arrangement have been excluded. The change to reported operating cash costs per ounce sold and AISC per ounce sold is $93 per ounce and $59 per ounce, respectively.

Average Realized Price per Ounce Sold

In the gold mining industry, average realized price per ounce sold is a common performance measure that does not have any standardized meaning. The most directly comparable measure prepared in accordance with GAAP is revenue from gold sales. Average realized price per ounces sold should not be considered in isolation or as a substitute for measures prepared in accordance with GAAP. The measure is intended to assist readers in evaluating the total revenues realized in a period from current operations.

Three months ended Nine months ended
Sept. 30,
2025
June 30,
2025
Sept. 30,
2025
$ Thousands unless otherwise indicated
Revenue $ 230,993 $ 142,010 $ 373,003
Ounces sold 66,200 42,550 108,750
Average realized price per ounce sold ($) $ 3,489 $ 3,337 $ 3,430


Adjusted Net Earnings and Adjusted Net Earnings per Share

Adjusted net earnings and adjusted net earnings per share are used by management and investors to measure the underlying operating performance of the Company. Adjusted net earnings is defined as net earnings adjusted to exclude the after-tax impact of specific items that are significant, but not reflective of the underlying operations of the Company, including foreign exchange gains and losses and other non-recurring items. Adjusted net earnings per share is calculated using the weighted average number of shares outstanding for adjusted net earnings per share.

Three months ended Nine months ended
$ Thousands unless otherwise stated Sept. 30,
2025
Sept. 30,
2024
June 30,
2025
Sept. 30,
2025
Sept. 30,
2024
Net earnings $ 42,439 $ (3,860) $ 5,534 $ 41,521 $ (9,503)
Business development expenses 1,638 255 16,619 21,792 334
Foreign exchange loss (gain) (9,162) 1,269 6,821 (2,469) 2,755
TSA 3,317 - 2,416 5,733 -
Severance 397 - - 397 -
Impairment 2,140 - - 2,140 -
PPA adjustment - inventory 18,493 - - 18,493 -
Income tax related to above adjustments 1,828 - (2,956) (1,128) -
Adjusted net earnings $ 61,090 $ (2,336) $ 28,434 $ 86,479 $ (6,414)
Weighted average shares outstanding - basic ('000s) 802,837 397,696 735,616 647,997 399,538
Adjusted net earnings per share ($) $ 0.08 $ (0.01) $ 0.04 $ 0.13 $ (0.02)


Earnings before Interest, Taxes, Depreciation, and Amortization ("EBITDA")

EBITDA represents net earnings before interest, taxes, depreciation and amortization. EBITDA is an indicator of the Company's ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures.

The following is a reconciliation of EBITDA to the consolidated financial statements:

Three months ended Nine months ended
$ Thousands Sept. 30,
2025
Sept. 30,
2024
June 30,
2025
Sept. 30,
2025
Sept. 30,
2024
Net earnings $ 42,439 $ (3,860 ) $ 5,534 $ 41,521 $ (9,503 )
Add back:
Finance costs 15,170 3 14,307 29,603 9
Depreciation and amortization 35,826 - 16,384 52,210 -
Income tax expenses (recovery) 28,675 - 18,976 47,651 -
EBITDA $ 122,110 $ (3,857 ) $ 55,201 $ 170,985 $ (9,494 )


Working Capital

Working capital is a non-GAAP measure. In the gold mining industry, working capital is a common measure of liquidity, but does not have any standardized meaning. The most directly comparable measure prepared in accordance with GAAP is current assets and current liabilities. Working capital is calculated by deducting current liabilities from current assets. Working capital should not be considered in isolation or as a substitute for measures prepared in accordance with GAAP. The measure is intended to assist readers in evaluating the Company's liquidity. Working capital is reconciled to the amounts in the Consolidated Statements of Financial Position as follows:

September 30,
2025
December 31,
2024
$ Thousands
Current assets $ 439,406 $ 22,937
Current liabilities 215,181 5,984
Working capital $ 224,225 $ 16,953

FORWARD-LOOKING STATEMENTS

Neither TSX Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release is not for distribution to United States newswire services or for dissemination in the United States.

This news release does not constitute an offer to sell or a solicitation of an offer to buy nor shall there be any sale of any of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful, including any of the securities in the United States of America. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "1933 Act") or any state securities laws and may not be offered or sold within the United States or to, or for account or benefit of, U.S. Persons (as defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable state securities laws, or an exemption from such registration requirements is available.

Cautionary Note Regarding Forward-Looking Statements

This news release may include forward-looking statements that are subject to inherent risks and uncertainties. All statements within this news release, other than statements of historical fact, are to be considered forward looking. Although Discovery believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those described in forward-looking statements. Statements include but are not limited to the development of the Porcupine Operations and its attractive economics and significant exploration upside; construction decision and development, the anticipated capital and operating costs, sustaining costs, net present value, internal rate of return, the method of mining the Porcupine Operations, payback period, process capacity, average annual metal production, average process recoveries, concession renewal, permitting of the assets, anticipated mining and processing methods, feasibility study production schedule and metal production profile, anticipated construction period, anticipated mine life, expected recoveries and grades, anticipated production rates, infrastructure, social and environmental impact studies, the completion of key de-risking items, including the timing of receipt permits, availability of water and power, availability of labour, job creation and other local economic benefits, tax rates and commodity prices that would support development of the Cordero Project, and other statements that express management's expectations or estimates of future performance, operational, geological or financial results Information concerning mineral resource/reserve estimates and the economic analysis thereof contained in the results of the feasibility study are also forward-looking statements in that they reflect a prediction of the mineralization that would be encountered, and the results of mining, if a mineral deposit were developed and mined. Forward-looking statements are statements that are not historical facts which address events, results, outcomes or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties.

Factors that could cause actual results to differ materially from those described in forward-looking statements include fluctuations in market prices, including metal prices, continued availability of capital and financing, and general economic, market access restrictions or tariffs, changes in U.S. laws and policies regarding regulating international trade, including but not limited to changes to or implementation of tariffs, trade restrictions, or responsive measures of foreign and domestic governments, changes to cost and availability of goods and raw materials, along with supply, logistics and transportation constraints, changes in general economic conditions including market volatility due to uncertain trade policies and tariffs, , the actual results of current and future exploration activities; changes to current estimates of mineral reserves and mineral resources; conclusions of economic and geological evaluations; changes in project parameters as plans continue to be refined; the speculative nature of mineral exploration and development; risks in obtaining and maintaining necessary licenses, permits and authorizations for the Company's development stage and operating assets; the accuracy of historical and forward-looking operational and financial information estimates provided by Newmont; the Company's ability to integrate the Porcupine Operations; statements regarding the Porcupine Operations, including the results of technical studies and the anticipated capital and operating costs, sustaining costs , internal rate of return, concession or claim renewal, the projected mine life and other attributes of the Porcupine Operations, including net present value, the timing of any environmental assessment processes, reclamation obligations; operations may be exposed to new diseases, epidemics and pandemics, including any ongoing or future effects of COVID-19 (and any related ongoing or future regulatory or government responses) and its impact on the broader market and the trading price of the Company's shares; provincial and federal orders or mandates (including with respect to mining operations generally or auxiliary businesses or services required for operations) in Canada and Mexico, all of which may affect many aspects of the Company's operations including the ability to transport personnel to and from site, contractor and supply availability and the ability to sell or deliver mined silver; changes in national and local government legislation, controls or regulations; failure to comply with environmental and health and safety laws and regulations; labour and contractor availability (and being able to secure the same on favourable terms); disruptions in the maintenance or provision of required infrastructure and information technology systems; fluctuations in the price of gold or certain other commodities such as, diesel fuel, natural gas, and electricity; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges and changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing and recovery rate estimates and may be impacted by unscheduled maintenance); changes in foreign exchange rates (particularly the Canadian dollar, U.S. dollar and Mexican peso); the impact of inflation; geopolitical conflicts; employee and community relations; the impact of litigation and administrative proceedings (including but not limited to mining reform laws in Mexico, or litigations involving First Nation(s)) and any interim or final court, arbitral and/or administrative decisions; disruptions affecting operations; availability of and increased costs associated with mining inputs and labour; delays in construction decisions and any development of the Cordero Project or other projects at the Porcupine Operations; changes with respect to the intended method of mining and processing ore from the Porcupine Operations; inherent risks and hazards associated with mining and mineral processing including environmental hazards, industrial accidents, unusual or unexpected formations, pressures and cave-ins; the risk that the Company's mines may not perform as planned; uncertainty with the Company's ability to secure additional capital to execute its business plans; contests over title to properties; expropriation +or nationalization of property; political or economic developments in Canada and Mexico and other jurisdictions in which the Company may carry on business in the future; increased costs and risks related to the potential impact of climate change, including risks associated with increased frequency of natural disasters such as fire, floods and seismicity; the costs and timing of exploration, construction and development of new deposits; risk of loss due to sabotage, protests and other civil disturbances; the impact of global liquidity and credit availability and the values of assets and liabilities based on projected future cash flows; risks arising from holding derivative instruments; and business opportunities that may be pursued by the Company. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. Discovery does not assume any obligation to update any forward-looking statements except as required under applicable laws. The risks and uncertainties that may affect forward-looking statements, or the material factors or assumptions used to develop such forward-looking information, are described under the heading "Risks Factors" in the Company's Annual Information Form dated March 26, 2025, which is available under the Company's issuer profile on SEDAR+ at www.sedarplus.ca.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/010f5585-3765-4da0-a067-904cca010400