Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Aya Gold & Silver Provides Annual Exploration Update

21.01.2025  |  GlobeNewswire

MONTREAL, Jan. 21, 2025 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) ("Aya" or the "Corporation") provides an annual exploration update on its 2024 drill exploration program at the Zgounder Silver Mine and the Boumadine Project in the Kingdom of Morocco.

Highlights1

1 All intersections are in core lengths. The holes were drilled at different angles; the actual thickness is not known at this time. Ag equivalent is based on a silver price of US$21/oz with a process recovery of 89%, a gold price of US$1,900/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 76.9 g/t Ag; 1% Cu: 97.63 g/t Ag; 1% Pb: 27.7 g/t Ag; and 1% Zn: 28.1 g/t Ag.

"Exploration success at both Zgounder and Boumadine during 2024 has been instrumental in driving the growth of our assets, with exceptional intercepts highlighting the potential to significantly increase high-grade ounces in the near term," commented Benoit La Salle, President & CEO. "Our completion of over 150,000 meters of drilling, combined with the use of high-resolution spectral imagery and geophysics technology, have been crucial in achieving exploration success and uncovering new opportunities. By expanding our footprint with the addition of over 150 km² of ground in Morocco, we are committed to creating value for all shareholders through the drill bit and will continue this growth momentum into 2025."

Summary of Exploration Results

Zgounder Exploration

The Zgounder Mine is a volcanic Ag mineralization sediment hosted deposit, underground and open pit mine in the central Anti-Atlas mountains of Morocco. Best intercepts for 2024 are shown in Table 1.

Table 1 - Best Intercepts at Zgounder in 2024 (core lengths)

Hole ID From To Ag
(g/t)
Length
(m)*
Ag x
width
Surface DDH
ZG-23-35 85.0 100.0 683 15.0 10,247
ZG-23-54 56.0 63.0 1,846 7.0 12,923
Including 56.0 61.0 2,095 5.0 10,476
Underground DDH
DZG-SF-23-292 46.5 51.0 2,430 4.5 10,933
Including 47.5 50.0 4,174 2.5 10,434
ZG-SF-23-084 133.5 147.0 1,089 13.5 14,706
Including 136.5 144.0 1,700 7.5 12,753
ZG-SF-23-084 163.5 168.0 4,469 4.5 20,109
DZG-SF-24-007 88.5 92.5 2,511 4.0 10,043
ZG-SF-24-123 274.0 276.5 5,696 2.5 14,240
DZG-SF-24-027 69.5 71.0 7,631 1.5 11,446
DZG-SF-24-065 79.0 85.5 2,870 6.5 18,652
Including 80.0 82.0 7,229 2.0 14,458
DZG-SF-24-081 35.5 45.0 1,339 9.5 12,722
Including 35.5 39.5 2,984 4.0 11,934
DZG-SF-24-111 4.5 11.0 2,372 6.5 15,420
Including 7.0 9.5 5,674 2.5 14,184
ZG-SF-24-200 265.0 286.0 1,151 21.0 24,166
Including 280.0 286.0 3,290 6.0 19,738
DZG-SF-24-145 13.0 16.0 4,645 3.0 13,934
Including 13.0 15.0 6,703 2.0 13,406
DZG-SF-24-153 56.0 60.0 3,955 4.0 15,818
DZG-SF-24-172 22.5 43.5 2,165 21.0 45,474
Including 30.5 34.0 4,600 3.5 16,100
DZG-SF-24-272 4.0 9.5 1,849 5.5 10,170
Surface RC
ZG-RC-24-028 2.0 26.0 986 24.0 23,672
Including 18.0 22.0 4,418 4.0 17,672
ZG-RC-24-031 8.0 22.0 744 14.0 10,416
ZG-RC-24-082 24.0 40.0 1,155 16.0 18,472
Including 33.0 38.0 2,335 5.0 11,676
ZG-RC-24-243 0.0 25.0 420 25.0 10,504
ZG-RC-24-154 19.0 38.0 711 19.0 13,512
ZG-RC-24-169 20.0 42.0 485 22.0 10,680
ZG-RC-24-228 25.0 45.0 1,356 20.0 27,128
Including 28.0 42.0 1,799 14.0 25,192
ZG-RC-24-235 0.0 13.0 778 13.0 10,116
ZG-RC-24-277 33.0 50.0 2,425 17.0 41,232
Including 37.0 42.0 6,311 5.0 31,556
ZG-RC-24-303 22.0 28.0 1,970 6.0 11,820
ZG-RC-24-318 8.0 17.0 1,143 9.0 10,284
ZG-RC-24-345 15.0 31.0 876 16.0 14,016
Including 22.0 27.0 2,018 5.0 10,092
ZG-RC-24-355 0.0 20.0 555 20.0 11,092

The holes were drilled at different angles; the actual thickness is not known at this time.

Figure 1: Location of Drill Hole at Zgounder


Zgounder Regional Exploration

Exploration drilling focused on near-mine targets within a 2km radius around the Zgounder deposit with a total of 10,651m drilled.

Figure 2: Location of Drill Hole at Zgounder Surface


Boumadine Project

Boumadine is a large polymetallic deposit (Ag, Au, Pb, Zn) located in the Anti-Atlas Mountains, 80km south-west of the city of Errachidia. The main mineralization generally consists of 1m to 4m wide (locally reaching over a 10m width) N340- oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite. The Tizi and Imarriren zones share the same characteristics except for their N000 orientation. Best intercepts for 2024 are shown in Table 2.

Table 2 - Best Intercepts at Boumadine in 2024 (core lengths)

DDH No.

Section

Zone

From To Length Au Ag Cu Pb Zn Mo Ag
Eq
(m) (m) (m) (g/t) (g/t) (%) (%) (%) (g/t) (g/t)
BOU-DD23-214 8850N Main 214.0 223.0 9.0 4.77 61 0.12 0.07 0.19 5 535
Including 216.2 221.5 5.3 6.61 90 0.18 0.10 0.27 6 749
BOU-DD23-218 8850N Para 244.3 247.5 3.2 14.72 19 0.02 0.19 0.15 4 1,411
BOU-DD23-218 8850N Para 252.6 256.8 4.2 13.59 115 0.10 0.13 0.12 3 1,409
BOU-DD23-218 8850N Main 280.3 286.1 5.8 9.21 80 0.21 0.06 0.14 8 978
Including 280.3 284.3 4.0 13.05 108 0.29 0.07 0.19 8 1,377
BOU-DD23-220 6575N Main 105.0 115.9 10.9 1.77 91 0.09 1.72 4.53 133 575
Including 112.3 114.7 2.4 6.26 261 0.26 1.24 6.56 16 1,275
BOU-DD23-220 6575N Para 133.4 136.8 3.4 0.89 76 0.26 2.47 6.97 7 649
BOU-DD23-223 6525N Main 131.6 169.9 38.3 1.53 311 0.04 1.8 4.4 101 763
Including 144.9 155.9 11.0 2.34 494 0.06 1.89 3.93 36 996
BOU-DD23-225 9325N Para 47.4 53.7 6.3 1.44 54 0.02 0.85 5.34 12 508
Including 50.8 53.7 2.9 2.88 86 0.04 0.96 9.90 21 927
BOU-DD23-227 9325N Main 259.7 268.3 8.6 3.34 18 0.07 0.13 0.45 6 369
Including 263.5 268.3 4.8 5.42 21 0.07 0.08 0.11 7 545
BOU-DD23-228 6300N Main 267.2 276.1 8.9 1.99 81 0.02 1.03 3.36 59 488
Including 267.7 273.0 5.3 3.09 119 0.03 1.45 4.66 87 715
BOU-DD23-229 6525N Para 111.9 116.0 4.1 1.60 175 0.12 1.86 7.32 259 810
BOU-DD23-230 6575N Main 166.6 184.2 17.6 2.64 247 0.27 1.24 7.74 86 991
Including 177.6 181.3 3.7 2.91 651 0.08 3.18 11.49 106 1,662
BOU-DD23-230 6575N Para 188.2 202.3 14.1 2.78 97 0.24 0.41 6.52 31 755
BOU-DD23-245 6450N Main 198.4 206.5 8.1 0.73 122 0.02 2.32 4.68 68 524
Including 198.4 200.2 1.8 1.83 299 0.06 4.83 13.08 269 1,355
BOU-DD23-248 6450N Main 329.5 335.4 5.9 5.94 59 0.13 0.95 8.75 23 1,136
BOU-DD23-251 6450N Main 345.9 355.3 9.4 2.66 32 0.04 0.21 4.39 14 531
Including 346.4 348.8 2.4 7.99 91 0.13 0.30 15.77 19 1,719
Including 314.0 318.8 4.8 6.76 36 0.06 0.11 0.16 0 569
BOU-DD23-265 8850N Main 338.0 341.1 3.1 16.25 86 0.13 0.14 0.12 0 1,355
BOU-DD23-265 8850N Para 366.0 374.0 8.0 4.51 58 0.23 0.20 0.32 0 442
Including 369.7 372.3 2.6 12.17 160 0.69 0.31 0.51 0 1,186
BOU-DD24-284 9950N Imarriren 439.7 441.6 1.9 15.70 91 0.16 0.06 0.05 4 1,317
BOU-DD24-306 3478100 Tizi 314.1 317.1 3.0 11.48 89 0.24 0.15 0.78 3 1,021
Including 314.1 315.6 1.5 20.05 133 0.37 0.20 1.37 2 1,755
BOU-DD24-310 34777500 Tizi 58.0 71.7 13.7 4.90 42 0.06 0.37 0.35 9 445
Including 58.0 59.6 1.6 23.34 148 0.20 0.41 0.50 17 1,988
BOU-DD24-310 34777500 Tizi 281.4 282.4 1.0 0.08 7,820 0.17 5.50 1.46 7 8,036
BOU-DD24-329 East-West East-West 142.1 144.0 1.9 0.03 1,937 1.66 0.16 0.17 7 2,110
BOU-DD24-353 East-West East-West 354.0 356.3 2.3 0.06 107 0.26 4.78 36.67 5 1,300

The holes were drilled at different angles; the actual thickness is not known at this time.

Figure 3: Location of Drill Holes at Boumadine


Figure 4: Location of New Permits at Boumadine


Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of the core is kept on site for reference. Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core. Drill core samples were transported in sealed bags for analysis at Afrilab laboratory in Marrakech. Standards of different grades and blanks were inserted every 20 samples in addition to the standards, blanks and pulp duplicate inserted by Afrilab.

David Lalonde, B.Sc. P. Geo, Vice-President Exploration, is Aya Gold & Silver's Qualified Person and has reviewed this press release for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and is exploring its properties along the prospective South-Atlas Fault, several of which have hosted past-producing mines and historical resources. Aya's Moroccan mining assets are complemented by its Tijirit Gold Project in Mauritania, which, subject to the announcement of September 12, 2024, will be developed by Mx2 Mining, a new spinout gold-growth company.

Aya's management team has been focused on maximizing shareholder value by anchoring sustainability at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya's website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA
President & CEO
benoit.lasalle@ayagoldsilver.com

Alex Ball
VP, Corporate Development & IR
alex.ball@ayagoldsilver.com

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"), which reflects management's expectations regarding Aya's future growth and business prospects (including the timing and development of new deposits and the success of exploration activities) and other opportunities. Wherever possible, words such as "confirm", "expected", "potential", "continue", "increase", "create", "significant", , and similar expressions or statements that certain actions, events or results "may", "could", "would", "might", "will", or are "likely" to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific forward-looking statements in this press release include, but are not limited to, statements and information with respect to the continuity of the mineralization and its grade, the potential to significantly increase high-grade ounces, the potential to create value through exploration to continue the growth momentum enhancing the resource and better understanding the deposit as well as exploration results in the open-pit and underground areas. Although the forward-looking information contained in this press release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with such forward-looking information. Such forward-looking statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions, and its expectations of future developments that management believe to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among other things, the ability to obtain any requisite governmental approvals, obtaining regulatory permits for on-site work, importing goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of silver, the price of gold, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being affected by metallurgical characteristics) and other factors, such as project execution delays, many of which are beyond the control of Aya, as well as other risks and uncertainties which are more fully described in Aya's 2023 Annual Information Form dated March 28, 2024, and in other filings of Aya with securities and regulatory authorities which are available on SEDAR+ at www.sedarplus.ca. Aya does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya include its subsidiaries unless the context requires otherwise.

Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/d0544898-5122-4b38-9c97-b7c0bbb78425
https://www.globenewswire.com/NewsRoom/AttachmentNg/5db8a284-5543-4d90-afea-0ad164d115b4
https://www.globenewswire.com/NewsRoom/AttachmentNg/422d0f01-6744-46d0-8af3-e826bfbea4a2
https://www.globenewswire.com/NewsRoom/AttachmentNg/0faf005f-12fb-4290-b254-b71b474f71ab