Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Denison Reports Financial and Operational Results for 2022, Including Significant De-Risking and Regulatory Milestones

09.03.2023  |  CNW

TORONTO, March 9, 2023 - Denison Mines Corp. ('Denison' or the 'Company') (TSX: DML) (NYSE American: DNN) today filed its Condensed Consolidated Financial Statements and Management's Discussion & Analysis ('MD&A') for the year ended December 31, 2022. Both documents will be available on the Company's website at www.denisonmines.com, SEDAR (at www.sedar.com) and EDGAR (at www.sec.gov/edgar.shtml). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. View PDF version.

David Cates, President and CEO of Denison commented, "Our results from 2022 reflect an incredibly successful year highlighted by significant de-risking and regulatory milestones supporting the continued advancement of our flagship Wheeler River project.

We made history with the successful permitting, procurement, construction, commissioning and operation of the Feasibility Field Test ('FFT') facilities at the high-grade Phoenix uranium deposit ('Phoenix') - where we achieved the first known recovery of uranium bearing solution via in-situ recovery ('ISR') mining in Saskatchewan's prolific Athabasca Basin region. The FFT was accomplished through the tireless efforts of our Saskatoon-based technical team over the past four years to systematically de-risk the use of ISR mining through extensive field and laboratory testing programs. The highly successful results of the FFT clearly demonstrate that the Phoenix deposit is amenable to ISR mining and that the Company can move confidently ahead with its plans to complete a feasibility study for the project during the first half of 2023.

In parallel to our technical de-risking efforts, we achieved a notable milestone in the permitting process for the planned Phoenix ISR project with the submission of a draft Environmental Impact Statement ('EIS'), which follows from several years of baseline environmental data collection, technical assessments, and extensive engagement and consultation with Indigenous and non-Indigenous interested parties. The draft EIS demonstrates that the project can be constructed, operated, and decommissioned in a manner that has fewer residual effects remaining after mitigation than conventional open pit or underground mining and milling operations - potentially achieving a superior standard of environmental sustainability and re-shaping the future of uranium mining in Saskatchewan.

I'm proud of the exceptional efforts of our growing and highly motivated team to challenge the norm and achieve what others may have previously considered impossible - with the result positioning Denison as an industry leader on the cusp of deploying the world's lowest cost uranium mining method at one of the world's highest grade uranium deposits. Our timing is excellent, as our success comes while we are observing sustained improvements in both global sentiment towards nuclear energy's necessity in the battle against climate change and the underlying uranium market."

Highlights

The Company then successfully completed the neutralization phase of the FFT, after which sampling of monitoring wells around the FFT site confirmed the successful restoration of the leaching zone to environmentally acceptable pH conditions, as outlined in the applicable regulatory approvals for the FFT. The neutralization phase was designed to confirm certain environmental assessment assumptions and verify the efficiency and effectiveness of the neutralization process planned for ISR mining at Phoenix.

The final phase of the FFT, which involves management of the recovered solution, is expected to commence in the spring of 2023.

Other ISR field work completed in 2022 included the installation of additional test wells in multiple three-spot test patterns at the Phoenix site in order to assess the ISR mining conditions in additional areas of Phoenix, as well as the completion of extensive hydrogeologic test work and a substantial borehole geophysics program.

The results of the FFT and additional test work completed in 2022 are expected to inform and support the completion of the Feasibility Study ('FS') initiated for Phoenix in late 2021.

About Denison

Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison's common shares are listed on the Toronto Stock Exchange under the symbol 'DML' and on the NYSE American exchange under the symbol 'DNN'.

Denison is a uranium exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. A Pre-Feasibility Study ('PFS') was completed for Wheeler River in late 2018, considering the potential economic merit of developing Phoenix as an ISR operation and the Gryphon deposit as a conventional underground mining operation. Denison's interests in Saskatchewan also include a 22.5% ownership interest in the MLJV, which includes several uranium deposits and the McClean Lake uranium mill, which is contracted to process the ore from the Cigar Lake mine under a toll milling agreement, plus a 25.17% interest in the Midwest Main and Midwest A deposits and a 67.41% interest in the Tthe Heldeth Túé ('THT', formerly J Zone) and Huskie deposits on the Waterbury Lake property. The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill.

Through its 50% ownership of JCU, Denison holds additional interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).

Denison's exploration portfolio includes further interests in properties covering approximately 300,000 hectares in the Athabasca Basin region.

Denison is also engaged in post-closure mine care and maintenance services through its Closed Mines group, which manages Denison's reclaimed mine sites in the Elliot Lake region and provides related services to certain third-party projects.

Technical Disclosure and Qualified Person

The technical information contained in this press release has been reviewed and approved by Chad Sorba, P.Geo., Denison's Director, Technical Services, and Andy Yackulic, P.Geo., Denison's Director, Exploration, who are both Qualified Persons in accordance with the requirements of NI 43-101.

Follow Denison on Twitter @DenisonMinesCo

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS

Certain information contained in this press release constitutes 'forward-looking information', within the meaning of the applicable United States and Canadian legislation concerning the business, operations and financial performance and condition of Denison.

Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'plans', 'expects', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes', or the negatives and/or variations of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur', 'be achieved' or 'has the potential to'.

In particular, this press release contains forward-looking information pertaining to the following: projections with respect to exploration, development and expansion plans and objectives, including the scope, objectives and interpretations of the Feasibility Study process for the proposed ISR operation for the Phoenix deposit, including the FFT and metallurgical testing programs described herein and the interpretation of the results therefrom; expectations regarding regulatory applications and approvals and the elements thereof, including the EIS; expectations regarding the performance of the uranium market and global sentiment regarding nuclear energy; expectations regarding Denison's joint venture ownership interests; and expectations regarding the continuity of its agreements with third parties. Statements relating to 'mineral reserves' or 'mineral resources' are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, the results and underlying assumptions and interpretations of the PFS as well as de-risking efforts such as the ISR field programs discussed herein may not be maintained after further testing or be representative of actual conditions within the applicable deposits. In addition, Denison may decide or otherwise be required to extend its evaluation activities and/or the FS and/or otherwise discontinue testing, evaluation and development work if it is unable to maintain or otherwise secure the necessary approvals or resources (such as testing facilities, capital funding, etc.). Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed in the Management's Discussion and Analysis dated March 9, 2023 under the heading 'Risk Factors'. These factors are not, and should not be, construed as being exhaustive.

Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.

View original content to download multimedia:https://www.prnewswire.com/news-releases/denison-reports-financial-and-operational-results-for-2022-including-significant-de-risking-and-regulatory-milestones-301768503.html

SOURCE Denison Mines Corp.



Contact
David Cates, President and Chief Executive Officer, (416) 979-1991 ext. 362; Mac McDonald, Exec. Vice President & Chief Financial Officer, (416) 979-1991 ext. 242