Storm is Pleased to Announce Its Financial and Operating Results for the Three Months and Year Ended December 31, 2020

03.03.2021  |  Newsfile

Calgary, March 2, 2021 - Storm Resources Ltd. (TSX: SRX) ("Storm" or the "Company") has also filed its audited consolidated financial statements as at December 31, 2020 and for the three months and year then ended along with Management's Discussion and Analysis ("MD&A") for the same periods. This information appears on SEDAR at www.sedar.com and on Storm's website at www.stormresourcesltd.com.

Selected financial and operating information for the three months and year ended December 31, 2020, as well as reserves information at December 31, 2020, appears below and should be read in conjunction with the related financial statements and MD&A.

Thousands of Cdn$, except volumetric and
per-share amounts
Three Months
to Dec. 31, 2020
Three Months
to Dec. 31, 2019
Year Ended
Dec. 31, 2020
Year Ended
Dec. 31, 2019

FINANCIAL




Revenue from product sales(1) 52,941 48,671 155,065 173,422
Funds flow 22,350 18,469 56,824 59,549
Per share - basic and diluted ($) 0.18 0.15 0.47 0.49
Net income (loss) 17,873 2,906 (214) 11,313
Per share - basic and diluted ($) 0.15 0.02 (0.00) 0.09
Cash return on capital employed ("CROCE")(2) 12% 12% 12% 12%
Return on capital employed ("ROCE")(2)(4) 2% 4% 2% 4%
Capital expenditures 16,163 23,913 59,251 96,843
Debt including working capital deficiency/
surplus(2)(3)
131,705 128,901 131,705 128,901
Common shares (000s)



Weighted average - basic 121,581 121,557 121,563 121,557
Weighted average - diluted 122,536 121,557 121,563 121,557
Outstanding end of period - basic 121,689 121,557 121,689 121,557

OPERATIONS




(Cdn$ per Boe)



Revenue from product sales(1) 22.15 23.64 18.25 23.54
Transportation costs (4.81) (5.20) (5.36) (5.66)
Revenue net of transportation 17.34 18.44 12.89 17.88
Royalties (0.92) (1.59) (0.78) (1.11)
Production costs (4.13) (5.67) (4.64) (5.87)
Field operating netback(2) 12.29 11.18 7.47 10.90
Realized gain (loss) on risk management
contracts
(1.09) (0.80) 0.89 (1.20)
General and administrative (0.67) (0.70) (0.74) (0.93)
Interest and finance costs (0.96) (0.71) (0.85) (0.68)
Decommissioning expenditures (0.22) - (0.08) -
Funds flow per Boe 9.35 8.97 6.69 8.09
Barrels of oil equivalent per day (6:1) 25,985 22,375 23,219 20,182
Natural gas production



Thousand cubic feet per day 124,927 108,679 111,776 98,458
Price (Cdn$ per Mcf)(1) 3.21 3.28 2.64 3.21
Condensate production



Barrels per day 2,502 2,416 2,265 2,138
Price (Cdn$ per barrel)(1) 52.04 66.56 46.96 66.03
NGL production



Barrels per day 2,662 1,846 2,325 1,634
Price (Cdn$ per barrel)(1) 16.41 6.11 9.62 10.75
Wells drilled (net) 3.0 - 8.0 6.0
Wells completed (net) 4.0 - 7.5 5.0
Wells started production (net) 4.0 4.0 7.0 7.0

(1) Excludes gains and losses on risk management contracts.
(2) Certain financial amounts shown above are non-GAAP measurements. See discussion of Non-GAAP Measurements on page 38 of the MD&A. CROCE and ROCE are presented on a 12-month trailing basis.
(3) Excludes the fair value of risk management contracts, decommissioning liability and lease liability.
(4) Includes a non-cash unrealized loss on risk management contracts of $6.5 million for the year ended December 31, 2020 (December 31, 2019 - unrealized gain of $1.5 million).

PRESIDENT'S MESSAGE

2020 FOURTH QUARTER HIGHLIGHTS

Production benefitted from the start-up of four wells at Nig Creek in late October and cost structure continues to improve. Production costs decreased with increased volumes processed at the 100% working interest Nig Creek Gas Plant and transportation costs decreased with a higher proportion of natural gas sales into Western Canadian markets where pipeline tariffs are lower.

2020 YEAR-END HIGHLIGHTS

As planned, capital investment during the year was approximately equal to funds flow which resulted in year-over-year production growth of 15% and a material improvement in the cost structure.

RESERVE EVALUATION HIGHLIGHTS

Increases in all reserves categories in 2020 were largely the result of step-out wells drilled and completed during the year, start-up of the Nig Creek Gas Plant, and positive technical revisions for well performance exceeding forecasts.

Reserves




YOY Increase 2020 2019 2018
Proved Developed Producing ("PDP") (MBoe) +13% 49,134 43,322 42,204
Total Proved ("1P") (Mboe) +3% 160,496 156,118 149,905
Total Proved plus Probable ("2P") (MBoe) +2% 199,077 195,483 182,370
PDP as % of 2P
25% 22% 23%
1P as a % of 2P
81% 80% 82%
Reserve Life Index PDP 5.2 5.3 5.2
using fourth quarter production (years) 1P 16.9 19.1 18.3

2P 21.0 23.9 22.3

All-in Finding, Development & Acquisition ("FD&A") Cost




Including Change in Future Development Capital ("FDC")



2020 2019
2018
3-Year Total
PDP ($/Boe)
$4.14 $11.43
$5.24
$6.19
1P ($/Boe)
$4.16 $3.90
$6.01
$5.41
2P ($/Boe)
$5.07
$3.16
$5.10
$4.68
Recycle Ratio Using All-in FD&A Cost




2020 2019 2018 3-Year Total
Funds Flow (000s) $56,824 $59,549 $100,092 $216,465
Funds Flow Netback ($/Boe) $6.69 $8.09 $13.34 $9.27
PDP Recycle 1.6 0.7 2.5 1.5
1P Recycle 1.6 2.1 2.2 1.7
2P Recycle 1.3 2.6 2.6 2.0

OPERATIONS REVIEW

Umbach, Nig Creek and Fireweed Areas of Northeast British Columbia

Storm's land position is prospective for liquids-rich natural gas from the Montney formation and totals approximately 120,000 net acres (170 net sections) with 87 horizontal wells (81.9 net) drilled to the end of the fourth quarter.

Field activity in the fourth quarter included drilling three wells (3.0 net) at Umbach and finishing the completions and pipeline connections for four wells (4.0 net) at Nig Creek.

First quarter 2021 activity at Umbach will include completing and pipeline connecting three wells (3.0 net) and, at Fireweed, will include drilling three wells (1.5 net) plus constructing 19 kilometres of large diameter gathering and sales pipelines.

At the end of the fourth quarter, there were seven Montney horizontal wells (5.5 net) that had not started producing which included four wells (4.0 net) at Umbach and three wells (1.5 net) at Fireweed.

At Umbach (average 90% working interest), produced raw natural gas contains 1.2% H2S with field compression capacity totaling 150 Mmcf raw per day. Firm processing commitments total 80 Mmcf raw per day (65 Mmcf per day at McMahon Gas Plant and 15 Mmcf per day at Stoddart Gas Plant). Inlet volumes in the fourth quarter averaged 88 Mmcf per day. Activity in 2021 is expected to maintain production and includes drilling the remaining three wells (3.0 net) on a six-well pad and completing six wells (6.0 net) with three completions in Q1 and three completions in Q4.

At Nig Creek (100% working interest), produced raw natural gas contains up to 0.5% H2S and is directed to the 100% working interest sour gas plant that started up in February 2020. Gas plant inlet volumes in the fourth quarter averaged 50 Mmcf per day, sales were 9,930 Boe per day (46.2 Mmcf per day sales with total liquids of 48 barrels per Mmcf sales), and the production cost was $1.30 per Boe. Capacity of the gas plant is estimated to be 70 Mmcf raw per day at the current average H2S of 0.3% (versus design capacity of 50 Mmcf raw per day at 0.5% H2S). Future drilling is expected to include three to four wells each year to keep the gas plant full. Activity in 2021 will be focused on increasing volumes processed at the gas plant to 70 Mmcf raw per day which will come from adding inlet compression (expected to increase rates from existing wells by 10% to 30%) and from drilling and completing three to four wells (3.0 to 4.0 net) in the lower Montney where the H2S is below 0.1%.

Recent wells at Nig Creek continue to exceed expectations:

At Fireweed (50% working interest), activity was restarted in the fourth quarter of 2020 after being deferred following the collapse in the WTI crude oil price in April 2020. Based on production history from offsetting horizontal wells, first year average field condensate-gas ratios are expected to be 30 to 70 barrels per Mmcf raw which is 100% to 400% higher than at Umbach and Nig Creek. There are currently three standing wells (1.5 net) with two completed wells (1.0 net). Activity in 2021 will include constructing a 50 Mmcf raw per day field compression facility with 19 kilometres of gathering and sales pipelines (50% working interest), drilling five wells (2.5 net), and completing three wells (1.5 net). First production is expected in the fourth quarter of 2021 from five wells (2.5 net).

HEDGING

The objective of the commodity price hedging program is to support longer-term growth by protecting revenue on up to 50% of current production for the next 18 months and up to 25% for 19 to 36 months forward. The current hedge position is shown below (excludes price differential contracts which are shown in the financial statements). Future production growth is not hedged.


2021 2022
Natural Gas Hedges

% Current Nat Gas Production(1) 48% 18%
Collars 9,200 Mcf/d(2) 5,700 Mcf/d(2)
Floor Cdn$3.44 per Mcf(3) Floor Cdn$3.77 per Mcf(3)
Ceiling Cdn$4.10 per Mcf(3) Ceiling Cdn$4.71 per Mcf(3)
Fixed Price 51,200 Mcf/d(2) 16,500 Mcf/d(2)
Cdn$3.17 per Mcf(3) Cdn$3.41 per Mcf(3)
Crude Oil Hedges

% Current Liquids Production(1) 41% 11%
Collars 1,100 Bpd 400 Bpd
Floor WTI Cdn$52.44 per barrel(3) Floor WTI Cdn$58.11 per barrel(3)
Ceiling WTI Cdn$62.56 per barrel(3) Ceiling WTI Cdn$68.79 per barrel(3)
Fixed Price 800 Bpd 150 Bpd
WTI Cdn$53.41 per barrel WTI Cdn$65.32 per barrel(3)
225 Bpd Propane
Cdn$42.84 per barrel(3)
(1) Using Q4 2020 actual production.

(2) Using corporate average heat content 1.23 GJ per Mcf and 1.17 Mmbtu per Mcf.

(3) Hedges in US$ are converted using an exchange rate of Cdn$1.27 per US$1.


OUTLOOK

Production in the first quarter of 2021 is forecast to average 25,000 to 27,000 Boe per day while capital investment is estimated to be $25 million (approximately 45% allocated to the Fireweed area). Capital investment includes $4 million for equipment deposits related to the Fireweed facility and for inlet compression at the Nig Creek Gas Plant.

First quarter natural gas prices will benefit from elevated spot prices that were realized in February. Approximately 60% of corporate sales are at the daily index or spot price which included 26 Mmcf per day (30,000 Mmbtu per day) of sales at Chicago in February at an average of approximately US$14 per Mmbtu.

Updated guidance for 2021 is provided below. Forecast pricing is updated to reflect estimated prices to the end of the first quarter with prices for the remainder of the year being unchanged from previous guidance except for the WTI price which was increased to US$50 per barrel from US$40.

2021 Guidance

Initial
November 10, 2020
Current
March 2, 2021
Cdn$/US$ exchange rate 0.76 0.79
Chicago daily natural gas - US$/Mmbtu(1) $2.65 $3.50
AECO daily natural gas - Cdn$/GJ(1) $2.50 $2.60
BC Station 2 daily natural gas - Cdn$/GJ $2.50 $2.55
WTI - US$/Bbl $40.00 $51.00
Edmonton condensate diff - US$/Bbl ($3.00) ($2.25)
Est transportation cost - $/Boe not provided $4.50 - $4.75
Est revenue net of transport (excl hedges) - $/Boe $17.00 - $18.00 $19.50 - $20.50
Est royalty rate (% revenue net transportation) 7% - 8% 8% - 9%
Est production cost - $/Boe $4.00 - $4.50 $4.00 - $4.50
Est mid-point field operating netback - $/Boe(2) $11.95 $14.05
Est realized hedging gains or (losses) - $ million ($8.0 - $10.0) ($10.0 - $12.0)
Est cash G&A - $ million $6.0 - $7.0 $6.0 - $7.0
Est interest expense - $ million $7.0 - $8.0 $6.0 - $7.0
Est capital investment (excluding A&D) - $ million $85.0 - $90.0 $85.0 - $90.0
Forecast fourth quarter Boe/d
Forecast fourth quarter liquids Bbls/d
30,000 - 32,000
6,800 - 7,300
30,000 - 32,000
6,800 - 7,300
Forecast annual Boe/d
Forecast annual liquids Bbls/d
26,000 - 28,000
5,600 - 6,000
26,000 - 28,000
5,600 - 6,000
Est annual funds flow - $ million(3) $90.0 - $99.0 $109.0 - $120.0
Horizontal wells drilled - gross
Horizontal wells completed - gross
Horizontal wells starting production - gross
11 (9.0 net)
11 (10.0 net)
13 (11.0 net)
11 - 12 (8.5 - 9.5 net)
11 - 12 (10.5 - 11.5 net)
14 - 15 (11.5 - 12.5 net)


(1) Approximately 50% of natural gas sales are at the daily or spot price and 50% at the monthly index price.

(2) Based on the mid-point for each of revenue net of transportation, royalty rate and production costs.

(3) Based on the range for forecast annual production and using the mid-points for the estimated field operating netback, estimated cash G&A, estimated hedging gain or loss and estimated interest expense.

2021 Guidance History


Chicago
Daily
(US$/Mmbtu)
BC Station 2
Daily
(Cdn$/GJ)
WTI
(US$/Bbl)
Capital Investment
($ million)
Forecast
Annual
Funds Flow
($ million)
Forecast Annual
Production
(Boe/d)
Nov 10, 2020 $2.65 $2.50 $40.00 $85.0 - $90.0 $90.0 - $99.0 26,000 - 28,000
Mar 2, 2021 $3.50 $2.55 $51.00 $85.0 - $90.0 $109.0 - $120.0 26,000 - 28,000

Total capital investment in 2021 is unchanged from previous guidance at $85 to $90 million with approximately 40% invested in the first half of the year. This is expected to increase average annual production by 16% (using mid-point of guidance) and will result in further reductions to the cost structure.


Total
Investment
($million)
Infrastructure
($million)
Net Wells
Drilled
Net Wells
Completed
Net Wells
Starting Production
Fireweed $30 - $35 $19 2.5 1.5 2.5
Nig Creek $28 $7 3.0 - 4.0 3.0 - 4.0 3.0 - 4.0
Umbach $27
3.0 6.0 6.0
Total $85 - $90




Based on forecast production, natural gas sales into Canadian markets will increase from approximately 35% in 2020 to 54% in 2021. The sales split in 2021 is expected to be 46% at Chicago, 36% at BC Station 2, 11% at AECO and 7% at Alliance ATP. The natural gas marketing strategy will continue to be based on diversifying sales as much as possible to mitigate regional price differences caused by supply/demand imbalances that are difficult to predict in terms of timing and duration. Diversification also includes an approximate 50/50 split between sales at daily spot pricing and at monthly index pricing (price is set at the start of each month).

NGL prices net of transportation for 2021 are expected to show a modest increase to 20% to 25% of WTI Cdn$ from 18% in 2020. Although marketing deductions which reflect the transportation cost to sales hubs are expected to increase for the next contract year (April 2021 to March 2022), this is expected to be offset by higher propane and butane pricing.

Cost structure on a per-Boe basis is expected to show further improvement in 2021 as production costs decline with rising throughput at the Nig Creek Gas Plant where capacity is estimated to be approximately 70 Mmcf per day and the production cost is $1.30 per Boe. In addition, transportation costs will continue to decline as a higher proportion of natural gas production is sold into Western Canadian markets which have lower pipeline tariffs.

Development at Fireweed is progressing with activity in the first quarter including drilling three horizontal wells, constructing 19 kilometers of large diameter gathering and sales pipelines, and ordering major equipment for the facility. First production of approximately 2,500 Boe per day net is expected in the fourth quarter of 2021.

The focus continues to be on growing asset value and funds flow per share. Near term (2021 to 2022), this is expected to come from:

  1. Filling the Nig Creek Gas Plant where the production cost is $1.30 per Boe and liquids recovery is higher; and

  2. Development at Fireweed where condensate is expected to be a higher proportion of total production.

'Free cash flow' in 2021 is estimated to be approximately $80 million using the mid-point for estimated annual funds flow in guidance (based on estimated capital investment required to maintain production being $33 million to drill, complete and tie-in 6.0 net wells). This will be directed to development at Fireweed ($30 to $35 million), growth from Umbach and Nig Creek ($22 million to drill and complete three wells plus install inlet compression), with the remainder initially used to reduce debt which increases financial flexibility. As always, capital investment will remain flexible and may be adjusted up or down depending on commodity prices.

The considerable efforts of everyone at Storm are much appreciated, especially over the last year which was complicated by having to manage the impacts of the COVID-19 pandemic at work and in everyone's personal lives. In addition, the advice, guidance and, most of all, the support of the Board of Directors has been invaluable.

We look forward to reporting on our progress during 2021 which is currently benefitting from a 'tailwind' with improving commodity prices.

Respectfully,

/s/ Brian Lavergne

Brian Lavergne,
President and Chief Executive Officer

March 2, 2021

RESERVES AT DECEMBER 31, 2020

Storm's year-end reserve evaluation effective December 31, 2020 was prepared by InSite Petroleum Consultants Ltd. ("InSite") in a report dated February 23, 2021. InSite has evaluated all of Storm's natural gas and NGL reserves. The InSite price forecast at December 31, 2020 was used to determine estimates of net present value ("NPV"). Storm's Reserves Committee, which is made up of independent and appropriately qualified directors, has reviewed and approved the evaluation prepared by InSite, and the report of the Reserves Committee has been accepted by the Company's Board of Directors.

Reserves included herein are stated on a company gross basis (working interest before deduction of royalties without including any royalty interests) unless noted otherwise. All reserves information has been prepared in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities ("NI 51-101"). In addition to the information disclosed in this report, more detailed information will be included in Storm's Annual Information Form for the year ended December 31, 2020 (the "AIF").

Summary

(1) The all-in calculation reflects the result of Storm's entire capital investment program as it takes into account the effect of acquisitions, dispositions and revisions, as well as the change in FDC.

INFORMATION REGARDING DISCLOSURE ON OIL AND GAS RESERVES AND RESOURCES

All amounts are stated in Canadian dollars unless otherwise specified. Where applicable, natural gas has been converted to barrels of oil equivalent ("Boe") based on 6 Mcf:1 Boe. The Boe rate is based on an energy equivalent conversion method primarily applicable at the burner tip and does not recognize a value equivalent at the wellhead. Given that the value ratio based on the current price of crude oil as compared to natural gas is significantly different than the energy equivalency of the 6:1 conversion ratio, utilizing the 6:1 conversion ratio may be misleading as an indication of value. Production volumes and revenues are reported on a company gross basis, before deduction of Crown and other royalties, unless otherwise stated. Unless otherwise specified, all reserves volumes are based on "company gross reserves" using forecast prices and costs. The oil and gas reserves statement for the year ended December 31, 2020, which will include complete disclosure of oil and gas reserves and other information in accordance with NI 51-101, will be contained within the AIF which will be available on SEDAR.

References to estimates of oil and gas classified as DPIIP are not, and should not be confused with, oil and gas reserves.

Gross Company Interest Reserves as at December 31, 2020
(Before deduction of royalties payable, not including royalties receivable)


Sales Gas
(Mmcf)
NGL
(Mbbls)
6:1 Oil Equivalent (Mboe)
Proved producing 235,474 9,888 49,134
Proved non-producing 2,512 91 509
Total proved developed 237,986 9,979 49,643
Proved undeveloped 536,859 21,376 110,853
Total proved 774,845 31,355 160,496
Probable additional 184,797 7,782 38,582
Total proved plus probable 959,642 39,137 199,077


Numbers in this table may not add due to rounding.

Gross Company Reserve Reconciliation for 2020
(Gross company interest reserves before deduction of royalties payable)

6:1 Oil Equivalent (Mboe)

Proved Developed Producing Total
Proved
Probable Proved plus
Probable
December 31, 2019 - opening balance 43,322 156,118 39,365 195,482
Acquisitions - - - -
Discoveries - - - -
Extensions 12,314 15,077 2,617 17,695
Dispositions - - - -
Technical revisions 1,981 (2,214) (3,397) (5,611)
Economic factors - (1) (3) (4)
Production (8,484) (8,484) - (8,484)
December 31, 2020 - closing balance 49,134 160,496 38,582 199,077


Numbers in this table may not add due to rounding.

Reserve Life Index ("RLI") Using Fourth Quarter Production

(Years) 2020 2019 2018
PDP 5.2 5.3 5.2
1P 16.9 19.1 18.3
2P 21.0 23.9 22.3

Future Development Costs ("FDC")


Proved ($M) Proved Plus Probable ($M)
2021 79,738
91,588
2022 88,052
91,290
2023 152,159
157,517
2024 162,789
162,789
2025 154,008
173,925



Total FDC - undiscounted 636,745
677,109
Total FDC - discounted at 10% 491,281
522,790
($million)
2020 2019 2018
1P FDC
$ 637 $ 642 $ 686
2P FDC
$ 677 $ 675 $ 707


Note: InSite escalates capital costs at 2% per year after 2020.

All-in Finding, Development and Acquisition Costs ("FD&A")
(including acquisitions, dispositions and revisions)

Proved Developed Producing FD&A Cost (All-in)
2020

2019

2018

3 Year Total
Net capital investment (000s) $ 59,251
$ 96,843
$ 84,763
$ 240,857
Total capital including change in FDC (000s) $ 59,251
$ 96,843
$ 83,641
$ 239,735
Total reserve additions (Mboe)
14,296

8,469

15,967

38,732
All-in PDP FD&A cost (per Boe) $ 4.14
$ 11.43
$ 5.24
$ 6.19









Total Proved FD&A Cost (All-in)
2020

2019

2018

3 Year Total
Net capital investment (000s) $ 59,251
$ 96,843
$ 84,763
$ 240,857
Change in FDC (000s)
(5,724 )
(43,992 )
274,814

225,098
Total capital including change in FDC (000s) $ 53,527
$ 52,851
$ 359,577
$ 465,955
Total reserve additions (Mboe)
12,862

13,563

59,780

86,205
All-in 1P FD&A cost (per Boe) $ 4.16
$ 3.90
$ 6.01
$ 5.41









Total Proved Plus Probable FD&A Cost (All-in)
2020

2019

2018

3 Year Total
Net capital investment (000s) $ 59,251
$ 96,843
$ 84,763
$ 240,857
Change in FDC (000s)
2,022

(32,089 )
226,058

195,991
Total capital including change in FDC (000s) $ 61,273
$ 64,754
$ 310,821
$ 436,848
Total reserve additions (Mboe)
12,078

20,464

60,899

93,441
All-in 2P FD&A cost (per Boe) $ 5.07
$ 3.16
$ 5.10
$ 4.68

Finding and Development Costs ("F&D")
(excluding acquisitions, dispositions and revisions)

Total Proved F&D Cost
2020

2019

2018

3 Year Total
Capital expenditures excluding acquisitions and dispositions (000s)








$ 59,251
$ 96,843
$ 84,763
$ 240,857
Change in FDC (000s)
(5,724 )
(43,992 )
274,814

225,098
Total capital including change in FDC (000s) $ 53,527
$ 52,851
$ 359,577
$ 465,955
Reserve additions excluding acquisitions, dispositions, and revisions (Mboe)









15,077

12,582

43,347

71,007
1P F&D cost (per Boe) $ 3.55
$ 4.20
$ 8.30
$ 6.56









Total Proved Plus Probable F&D Cost
2020

2019

2018

3 Year Total
Capital expenditures excluding acquisitions and dispositions (000s)








$ 59,251
$ 96,843
$ 84,763
$ 240,857
Change in FDC (000s)
2,022

(32,089 )
226,058

195,991
Total capital including change in FDC (000s) $ 61,273
$ 64,754
$ 310,821
$ 436,848
Reserve additions excluding acquisitions, dispositions, and revisions (Mboe)









17,695

21,235

39,608

78,538
2P F&D cost (per Boe) $ 3.46
$ 3.05
$ 7.85
$ 5.56

Net Present Value Summary (before tax) as at December 31, 2020

Benchmark oil and NGL prices used are adjusted for quality of oil or NGL produced and for transportation costs. The calculated NPV include a deduction for estimated future well abandonment costs. The NPV disclosed does not represent fair market value of reserves.

(000s) Undiscounted Discounted at 5% Discounted at 10% Discounted at 15% Discounted at 20%
Proved producing 605,499 500,522 424,596 369,626 328,689
Proved non-producing 3,274 2,011 1,234 735 402
Total proved developed 608,773 502,533 425,830 370,361 329,091
Proved undeveloped 1,062,800 673,371 444,030 300,504 206,216
Total proved 1,671,573 1,175,904 869,860 670,866 535,307
Probable additional 586,211 314,231 187,609 121,789 84,236
Total proved plus probable 2,257,783 1,490,135 1,057,469 792,655 619,542


Numbers in this table may not add due to rounding.

Net Present Value Summary (after tax) as at December 31, 2020

Benchmark oil and NGL prices used are adjusted for quality of oil or NGL produced and for transportation costs. The calculated NPV each include a deduction for estimated future well abandonment costs. The NPV disclosed does not represent fair market value of reserves.

(000s) Undiscounted Discounted at 5% Discounted at 10% Discounted at 15% Discounted at 20%
Proved producing 567,508 479,585 411,915 361,509 323,293
Proved non-producing 2,355 1,433 851 471 214
Total proved developed 569,863 481,018 412,766 361,980 323,507
Proved undeveloped 786,430 487,236 311,724 202,596 131,492
Total proved 1,356,293 968,255 724,491 564,577 455,000
Probable additional 435,636 232,832 138,381 89,396 61,528
Total proved plus probable 1,791,929 1,201,086 862,872 653,973 516,528


Numbers in this table may not add due to rounding.

InSite Escalating Price Forecast as at December 31, 2020


Exchange
Rate
(US$/Cdn$)
WTI
Crude Oil
(US$/Bbl)
Condensate
(Cdn$/Bbl)
Henry Hub
Natural Gas
(US$/Mmbtu)
AECO
Natural Gas
(Cdn$/Mmbtu)
BC
Station 2
(Cdn$/Mmbtu)
2021 0.77 48.00 60.87 2.85 2.80 2.75
2022 0.77 51.00 64.56 2.91 2.71 2.66
2023 0.77 54.00 68.81 2.97 2.62 2.57
2024 0.77 55.08 70.78 3.02 2.67 2.62
2025 0.77 56.18 71.51 3.08 2.73 2.68

Boe Presentation - For the purpose of calculating unit revenues and costs, natural gas is converted to a barrel of oil equivalent ("Boe") using six thousand cubic feet ("Mcf") of natural gas equal to one barrel of oil unless otherwise stated. Boe may be misleading, particularly if used in isolation. A Boe conversion ratio of six Mcf to one barrel ("Bbl") is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. All Boe measurements and conversions in this report are derived by converting natural gas to oil in the ratio of six thousand cubic feet of gas to one barrel of oil. Mboe means 1,000 Boe.

Non-GAAP Measures - This document may refer to the terms "debt including working capital deficiency", "field operating netbacks", "field operating netbacks including hedging", "CROCE", "ROCE", the terms "cash" and "non-cash", "cash costs", and measurements "per commodity unit" and "per Boe" which are not recognized under Generally Accepted Accounting Principles ("GAAP") and are regarded as non-GAAP measures. These non-GAAP measures may not be comparable to the calculation of similar amounts for other entities and readers are cautioned that use of such measures to compare enterprises may not be valid. Non-GAAP terms are used to benchmark operations against prior periods and peer group companies and are widely used by investors, analysts and other parties. Additional information relating to certain of these non-GAAP measures can be found in Storm's MD&A dated March 2, 2021 for the period ended December 31, 2020 which is available on Storm's SEDAR profile at www.sedar.com and on Storm's website at www.stormresourcesltd.com.

Initial Production Rates - Initial production rates ("IP") provided refer to actual raw natural gas rates reported to the British Columbia government. IP rates are not necessarily indicative of long-term performance or of ultimate recovery.

Forward-Looking Information - This press release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws. The use of any of the words "will", "would", "expect", "anticipate", "intend", "believe", "plan", "potential", "outlook", "forecast", "estimate", "budget" and similar expressions are intended to identify forward-looking statements or information. More particularly, and without limitation, this press release contains forward-looking statements and information concerning: current and future years' guidance in respect of certain operational and financial metrics, including, but not limited to, commodity pricing, estimated average operating costs, estimated average royalty rate, estimated operations capital, estimated general and administrative costs, estimated quarterly and annual production and estimated number of horizontal wells drilled, completed and connected, capital investment plans, infrastructure plans, anticipated United States exports, pipeline capacity, price volatility mitigation strategy and cost reductions. Statements of "reserves" are also deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions, that the reserves described exist in the quantities predicted or estimated and that the reserves can be profitably produced in the future.

The forward-looking statements and information in this press release are based on certain key expectations and assumptions made by Storm, including: prevailing commodity prices and exchange rates; applicable royalty rates and tax laws; future well production rates; reserve and resource volumes; the performance of existing wells; success to be expected in drilling new wells; the adequacy of budgeted capital expenditures to carrying out planned activities; the availability and cost of services; and the receipt, in a timely manner, of regulatory and other required approvals. Although the Company believes that the expectations and assumptions on which such forward-looking statements and information are based are reasonable, undue reliance should not be placed on these forward-looking statements and information because of their inherent uncertainty. In particular, there is no assurance that exploitation of the Company's undeveloped lands and prospects will result in the emergence of profitable operations.

Since forward-looking statements and information address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of factors and risks. These include, but are not limited to the risks associated with the oil and gas industry in general such as: general economic conditions in Canada, the United States and internationally; operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to reserves, production, costs and expenses; health, safety and environmental risks; commodity price and exchange rate fluctuations; marketing and transportation of petroleum and natural gas and loss of markets; competition; ability to access sufficient capital from internal and external sources; geopolitical risk; stock market volatility; and changes in legislation, including but not limited to tax laws, royalty rates and environmental regulations.

Readers are cautioned that the foregoing list of factors is not exhaustive. Additional information on these and other factors that could affect the operations or financial results of the Company are included or are incorporated by reference in the Company's Annual Information Form dated March 30, 2020 and the MD&A dated March 2, 2021 for the period ended December 31, 2020 which are available on Storm's SEDAR profile at www.sedar.com and on Storm's website at www.stormresourcesltd.com.

The forward-looking statements and information contained in this press release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

For further information please contact:

Brian Lavergne
President & Chief Executive Officer

Michael J. Hearn
Chief Financial Officer

Carol Knudsen
Manager, Corporate Affairs

(403) 817-6145
www.stormresourcesltd.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/75897