Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Lithium Ionic Corp. Reports Updated Mineral Resource Estimate at its Bandeira Lithium Project, Brazil

06.05.2025  |  GlobeNewswire

Significantly Increases Global Mineral Resources in the Lithium Valley

Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") is pleased to announce an updated mineral resource estimate ("MRE") for its 100%-owned Bandeira Lithium Project ("Bandeira" or the "Project") located in Minas Gerais, Brazil. Bandeira is the Company's flagship property, located in Brazil's "Lithium Valley", a rapidly emerging hard rock lithium district renowned for its significant concentration of lithium-bearing pegmatites.

Prepared in accordance with National Instrument 43-101 ("NI 43-101") by independent consultants, GE21 Consultoria Mineral Ltda. ("GE21"), the updated MRE reflects continued growth and resource conversion across the deposit, underscoring the scale, geological continuity, and long-life potential of Bandeira as it advances toward development.

Bandeira Project - Mineral Resource Estimate Highlights

*See press release dated January 14, 2025, for details related to the Baixa Grande MRE (effective date of December 2, 2024; QP: Leonardo Soares, P.Geo., M.Sc., of GE21), and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled "Mineral Resource Estimate for Lithium Ionic, Itinga Project" (effective date of June 24, 2023; authored by Maxime Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, "Bandeira continues to grow substantially while maintaining consistent grade, further validating its robustness and scale potential. This updated resource supports our mine planning efforts and will be an important input as we work through detailed engineering and evaluate future production scalability."

Carlos Costa, P.Geo., Lithium Ionic's VP of Exploration, commented, "Since we first began exploration at Bandeira in April 2022, the Project has consistently exceeded our expectations. What started with just two promising rock samples has evolved into one of the largest spodumene-rich pegmatite deposits in the Jequitinhonha Valley. I am extremely proud of the capability, dedication, and achievements of our entire exploration team, and we believe there is still significant potential ahead."

The NI 43-101 technical report for the Bandeira MRE (the "Technical Report"), will be accessible on SEDAR+ (www.sedarplus.ca) under the Company' issuer profile, and on the Company's website, www.lithiumionic.com, within 45 days of this news release.

About the Bandeira Project

Bandeira covers 158 hectares, less than 1% of Lithium Ionic's 17,000-hectare land position, but has rapidly advanced to become one of the most promising lithium development-stage assets in Brazil. It is located adjacent to Sigma Lithium's Grota do Cirilo and Barreiro projects and directly beside Companhia Brasileira de Lítio's (CBL) long-standing underground lithium operation.

The Company has also established NI 43-101 compliant mineral resource estimates at two additional properties within the "Lithium Valley", Baixa Grande (formerly Salinas) and Outro Lado. Together, these assets bring Lithium Ionic's consolidated global mineral resource base to 36.76 million tonnes ("Mt") (1,188,473 LCE) in the Measured and Indicated category, in addition to 31.87 Mt (936,196 LCE) in the Inferred category, with the majority of the Company's regional land package remaining largely unexplored.

A NI 43-101 compliant feasibility study (the "Feasibility Study", the "Study") for Bandeira was announced on May 29, 2024, which outlined strong project economics, including a post-tax NPV8% of US$1.31 billion and an IRR of 40%. This Study was based on a smaller MRE with a data cut-off of November 13, 2023. This Feasibility Study remains valid and will be part of the forthcoming Technical Report, however the Company intends to integrate the expanded MRE into an updated Feasibility Study in the second half of 2025. On April 2, 2025, the Company engaged the globally recognized lithium advisory firm, RTEK International DMCC ("RTEK"), to help transition Bandeira from feasibility to construction and operations.

Table 1 - Bandeira Lithium Project Mineral Resource Estimate

Deposit /
Cut-Off Grade
Category Resource
(Mt)
Grade
(% Li2O)
Contained LCE
(kt)
Bandeira
(0.5% cut-off)
Measured 3.36 1.38 114.7
Indicated 23.91 1.33 786.4
Measured + Indicated 27.27 1.34 901.1
Inferred 18.55 1.34 614.7
  1. The Mineral Resource Estimation (MRE) effective date is November 20, 2024.
  2. The MRE has been prepared by Carlos J. E. Silva (MAIG #7868) in conformity with the CIM Estimation of Mineral Resource and Mineral Reserves Best Practices guidelines.
  3. The report adheres to the Canadian Securities Administrators' NI 43-101 requirements.
  4. Mineral resources are not mineral reserves and have not demonstrated economic viability. There is no certainty that any portion of the mineral resource will be converted into a mineral reserve.
  5. Figures are rounded to appropriate levels of precision, and discrepancies may occur due to rounding.
  6. The spodumene pegmatite domains were modelled using composites with Li?O grades exceeding 0.3%.
  7. Grade estimation was conducted using Ordinary Krigging within Leapfrog software.
  8. The MRE is confined to the Lithium Ionic Bandeira Target Claims (ANM) and includes only fresh rock domains.
  9. The MRE was constrained by the Reasonable Prospects for Eventual Economic Extraction (RPEEE) using a grade shell with a cut-off of 0.5% Li?O for underground resources.
  10. Inferred mineral resources are conceptual in nature and can only form the basis for economic analyses with further drilling and evaluation.


Figure 1. Bandeira Project Location

View Figure 1 here: https://www.globenewswire.com/NewsRoom/AttachmentNg/e9ec0883-0725-482d-bab9-3dcf5fb433fc


Figure 2. Isometric View of the Bandeira Deposit

View Figure 2 here: https://www.globenewswire.com/NewsRoom/AttachmentNg/69390a16-e410-4e39-b72f-37068f2fb19b

Details related to the calculation of the MRE

The MRE was prepared by Carlos Silva P.Geo., M.Sc., of GE21 (the "Author" or "QP") with an effective date of November 20, 2024.

The MRE was prepared using the following geological and resource block modeling parameters which are based on geological interpretations, geostatistical studies, and best practices in mineral estimation.

The QP is not aware of any factors or issues that materially affect the MRE other than normal risks faced by mining projects in the province in terms of environmental, permitting, taxation, socio-economic, marketing, and political factors, and additional risk factors regarding inferred resources.

Qualified Persons

Carlos José Evangelista Silva, MSc Geo. (MAIG membership number 7868), of GE21 is a Qualified Person as defined by NI 43-101 and has reviewed and approved the technical information and data regarding the MRE included in this news release. Mr. Silva is independent of Lithium Ionic. All other scientific and technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are "qualified persons" as defined in NI 43-101.

On behalf of the Board of Directors of Lithium Ionic Corp.

Blake Hylands
Chief Executive Officer, Director

About Lithium Ionic Corp.

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects are located in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL's Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.'s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Investor and Media Inquiries:

+1 647.316.2500
info@lithiumionic.com

Cautionary Note Regarding Forward-Looking Statements

This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Company's mineral properties including Bandeira, the Company's ability to produce a NI 43-101 compliant mineral resource estimate, PEA and/or Feasibility study and the timing thereof, the Company's ability to obtain the requisite licences and permits, the economic viability of the Bandeira project, the Company's ability to obtain adequate financing, the mineralization and development of the Company's mineral properties, the Company's exploration program and other mining projects and prospects thereof and the Company's future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.