Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Kuya Silver Announces Results of Independent Preliminary Economic Assessment

04.05.2022  |  Newsfile

Project NPV (5%) of $64.9 Million (Pre-Tax) and $46.2 Million (After-Tax) at $22.86/oz Silver Price
Robust After-Tax Payback of 0.60 Years with Pre-Production Toll Milling at $22.86/oz Silver Price
PEA Webinar to Be Held on Thursday, May 5th at 1:00PM ET (details below)

Vancouver, May 4, 2022 - Kuya Silver Corp. (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) (the "Company" or "Kuya Silver") is pleased to announce the summary results of a positive Preliminary Economic Assessment ("PEA") on the Bethania Silver Project (the "Project"). All financial figures in this news release are stated in United States dollars unless otherwise noted.

PEA Highlights:

David Stein, Kuya's President and CEO stated, "We are extremely pleased with the results of the independent PEA, confirming our vision that the Bethania Silver Project can and should be a low-cost silver producer in the future. We are pleasantly surprised by the low production cost profile, manageable CapEx and quick payback of the Project. Although the PEA gives us an excellent roadmap to pursure development of the Project, Kuya already sees opportunities to further optimize the Project and will pursue these ideas as we continue to develop the Project."

Preparation of the Preliminary Economic Assessment

The PEA was prepared by Mining Plus ("MP"), with contributions from other consultants. The PEA was prepared in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), and has an effective date of April 6, 2022. The PEA is based on the Mineral Resource estimate for the Project as set out in "National Instrument 43-101 Technical Report and Maiden Mineral Resource Estimate on the Bethania Silver Project, Department of Huancavelica, Province of Huancavelica, District of Acobambilla, Peru," a technical report prepared for the Company with an issue date of February 21, 2022, an effective date of January 6, 2022, and an effective date of December 10, 2021 for the Mineral Resource estimate (see the Company's February 22, 2022 news release). A technical report relating to the PEA, prepared in accordance with NI 43-101, will be filed on SEDAR and posted on the Company's website within 45 days of this news release.

The PEA is preliminary in nature, contains numerous assumptions, and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the results of the PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no assurance that Inferred Mineral Resources will ever be upgraded to Mineral Reserves. No Mineral Reserves have been estimated for Bethania.

In this news release, the terms "Mineral Resource," "Inferred Mineral Resource," "Indicated Mineral Resource," and "Mineral Reserve" have the meanings given to them in NI 43-101 by reference to the "Definition Standards for Mineral Resources and Mineral Reserves" (2014) of the Canadian Institute of Mining and Metallurgy.

For the PEA base case, the following metal price assumptions were used: Silver $25.40/oz, Gold $1850/oz, Zinc $1.21/lb, Lead $0.90/lb, and Copper $3.62/lb. The Company recognizes that silver prices have been especially volatile recently, and therefore readers should review the economic sensitivity to silver price shown in Table 7 of this news release.

Development Strategy

The PEA envisages a 350 tonne per day ("tpd") conventional cut and fill underground mine feeding a concentration plant that would process mineralized material at the same rate (126,000 tonnes per year) over a mine life of 6.5 years. The PEA recognizes the potential to toll-mill mineralized material during the final six months of the plant construction ("Toll-Milling Option") and modelled this as the base case in the PEA. While the Company needs to further investigate the logistics, benefits and risks of this potential strategy, in the analysis presented in the PEA, the Toll-Milling Option would greatly enhance the internal rate of return ("IRR") of the Project (188% after-tax IRR) and reduce the after-tax payback period to 0.5 years. The payback period is measured from the start of the first full year of production (Year 1).

Mineral Resources

Table 1: Mineral Resource Estimate used for the PEA.

Category Tonnage GRADE CONTAINED METAL
Ag Pb Zn Au Cu AgEq Ag AgEq
(oz/t) (%) (%) (g/t) (%) (oz/t) (oz) (oz)
Indicated 404,000 10.7 2.63 1.95 0.26 0.16 14.5 4,317,540 5,858,521
Inferred 700,000 8.0 2.51 1.58 0.24 0.12 11.4 5,600,256 8,006,431

Note: Metal price assumptions used for the Mineral Resource estimate were different than those used for the PEA. Silver equivalent (AgEq) is calculated using metal prices of $1,849.78/oz gold, $25.44/oz silver, $1,981.79/t lead, $2,658.62/t zinc, and $7,971/t copper, and by applying recovery factors of 0.4439, 0.9324, 0.9449, 0.9265, and 0.8829, respectively.

Mining

The analysis of potential mining methods consisted of a qualitative analyses, including the University of British Columbia analysis method, geomechanical evaluation, and operational evaluation and a quantitative analysis (i.e. financial). It was determined that conventional cut and fill with waste back-fill was the preferred mining technique.

Table 2: Production Schedule Summary.


Pre-production Year 1 Total LOM
Mineralized material (t) 40,142 125,452 857 ,078
NSR (US$/t) 306 238 218
Ag (oz/t) 12.31 9.23 8.21
Au (g/t) 0.15 0.16 0.2
Cu (%) 0.14 0.11 0.12
Pb (%) 2.11 2.57 2.32
Zn (%) 1.93 1.27 1.54

Table 3: Production by Mineral Resource Category.

Category Tonnes (t) Ag (oz/t) Pb (%) Zn(%) Cu(%) Au (g/t) NSR (US$/t) % Distribution
Indicated 310,710 9.34 2.24 1.7 0.14 0.23 243 36%
Inferred 546,368 7.57 2.37 1.46 0.11 0.19 203 64%
Total 857,078 8.21 2.32 1.54 0.12 0.2 218 100%


Recovery Methods (Processing)

A conventional flotation plant has been envisaged to be consistent with the Company's existing permits. The plant design includes:

Based on historical metallurgical testing and subsequent analysis, average recoveries for various metals are modelled to be:

Additional Project Infrastructure

In addition to infrastructure that already exists at the Project, the PEA envisages the construction and development of:

Capital Costs

The capital cost estimate has been developed to provide an estimate suitable for the PEA, including costs to design, procure, construct, and commission the facilities.

Table 4: Summary of Capital Cost Estimates.

Description US$
CAPEX Initial Sustaining Total
Mine $2.4M $2.7M $5.2M
Process Plant $6.6M $0.0M $6.6M
Tailings and Waste Rock Disposal $3.2M $0.8M $4.0M
Surface Components $1.3M $0.0M $1.3M
Owner's Costs $0.7M $0.0M $0.7M
Mine Closure $0.0M $1.9M $1.9M
Total Capital Cost Pre - Contingency $14.2M $5.4M $19.6M
Contingency Costs (25%) $3.6M $1.4M $4.9M
Total Capital Cost $17.8M $6.8M $24.5M


Operating Costs

Operating cost estimates have been developed to provide an estimate suitable for a PEA, including costs for mining and processing. The expected accuracy range of the operating cost estimate is +25%/-30%. For treatment and refining costs market rates provided by the Company from a November 2021 market study were used.

Table 5: Summary of Life-Of-Mine Operating Costs.

Operating Costs LOM (US$) US$/tonne milled
Mining $31.4M 36.67
Processing $20.6M 25.72
Third party processing cost (*) $1.4M
Tails and Waste Rock Placement $0.5M 0.59
Onsite G&A $14.1M 16.49
Total Operating Costs $68.1M 79.46
Treatment & Refining Charges $33.9M 39.54
Community Participation $0.9M 1.00
Total Cash Costs $102.8M 120.01
Sustaining Costs $3.4M 4.13
All-in Sustaining Costs ("AISC") $106.2M 124.14


Economic Analysis

The financial analysis was carried out using a discounted cash flow methodology, using a 5% discount rate for the base case. By including the Toll-Milling Option in the analysis preproduction (Year 0) income is generated prior to the completion of the processing facility. An assumption of $35/t for third party processing expenses was used for the Toll-Milling Option.

Table 6: Production and Cost Analysis.

Production and Cost Pre-Production (toll-milling) Year 1 Total LOM
Profile
Production (mt) 40 125 857
Silver, recovered (moz) 453 1,061 6,448
Silver, payable (moz) 428 1,004 6,101
Silver equivalent, payable (moz) 554 1,373 8,682
Silver revenue by % 77% 73% 70%
Silver grade 12.3 oz/t (383 g/t) 9.23 oz/t (287 g/t) 8.21 oz/t (255 g/t)
Silver equivalent grade 13.8 oz/t (429 g/t) 10.9 oz/t (340 g/t) 11.7 oz/t (315 g/t)
All-in Sustaining Cost ("AISC") ($/oz equivalent) 8.27 10.48 12.15

Table 7: Project Economics Summary and Sensitivity to Silver Price.


Economics Summary 80% Price Ag 90% Price Ag Price Ag 110% Price Ag 120% Price Ag

20.32 $/oz 22.86 $/oz 25.4 $/oz 27.94 $/oz 30.48$/oz
Pre-Tax NPV (5%) $51.9M $64.9M $77.8M $90.8M $103.7M
IRR 130% 173% 227% 298% 392%
Payback 0.68 0.53 0.41 0.32 0.24
After-Tax NPV (5%) $37.7M $46.2M $54.7M $63.2M $71.7M
IRR 116% 148% 188% 237% 304%
Payback 0.70 0.60 0.50 0.40 0.3


Note on Assumptions

The PEA results are based on important assumptions made by the Qualified Persons who prepared the PEA. These assumptions, including those mentioned above, and the justifications for them, will be described in the technical report relating to the PEA that the Company will file on SEDAR and post on the Company's website within 45 days of this news release.

Metal price assumptions are particularly important for an economic analysis of any mineral project. As noted above, the Qualified Persons used the following assumptions in the PEA: Silver $25.40/oz, Gold $1850/oz, Zinc $1.21/lb, Lead $0.90/lb, and Copper $3.62/lb. The price of silver has been highly volatile over the past two years, making it challenging to select an appropriate price for the purpose of the PEA, but the Company considers $25.40/oz to be a reasonable base case under the circumstances. Since the beginning of 2021, the closing daily price of silver has ranged between $21.49 and $29.42, and the price of silver exceeded $26.00/oz as recently as April 18, 2022. Further, the pricing assumptions used in the PEA for zinc and lead are conservative, which moderates or counterbalances the economic effect of the base case pricing assumption for silver. Finally, in Table 7 above, the economics of the Project are summarized using a range of pricing assumptions for silver, including assumptions equal to 80% and 90% of the base case.

In addition to the assumptions described throughout this news release, the Qualified Persons were required to make various assumptions on technical, economic, financial, regulatory, and operational matters, including but not limited to the following:

The following outlines the main taxation considerations applied in the financial model, according to the Peruvian tax regime for mining companies:

(i) A standard corporate tax rate of 29.5% is applied to taxable income;

(ii) A special mining tax is applied to operating profit resulting from the mining activity, the effective rate of which is calculated based on the operating margin and falls in the 3-4% range; and

(iii) workers' profit participation of 8% is applied to taxable income.

All-in sustaining costs ("AISC") consist of direct operating costs (mining, processing, tailings and waste rock disposal, site G&A) plus treatment and refining costs (including penalties), government royalties, community participation and sustain capital expenditures.

Although the Company believes that the assumptions underpinning the PEA are reasonable and appropriate, there can be no assurance that all of these assumptions will prove to be correct.

Qualified Persons

The technical content of this news release has been reviewed and approved by Mr. Edgard Vilela, MAusIMM (CP), Principal Mining Consultant, Mining Plus, Scott Jobin-Bevans (Ph.D., PMP, P.Geo.), Principal Geoscientist, Caracle Creek International Consulting Inc., and Simon Mortimer (M.Sc., FAIG), each of whom is a Qualified Person as that term is defined by NI 43-101. Each of these Qualified Persons is independent of the Company.

About Kuya Silver Corporation

Kuya Silver (www.kuyasilver.com) is a Canadian‐based mineral exploration and development company with a focus on acquiring, exploring, and advancing precious metals assets in Peru and Canada.

For further information, please contact the Company at:

Kuya Silver Corp.
Telephone: (604) 398‐4493
info@kuyasilver.com
www.kuyasilver.com

PEA Webinar

The Company will be hosting a webinar to review the results of the PEA on Thursday, May 5th at 10:00AM PT / 1:00PM ET. To register for the event please click the link below.

Registration link: https://event.webinarjam.com/register/3/p512nh4

Reader Advisory

This news release contains statements that constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs, and current expectations of the Company, its directors, or its officers with respect to the future business activities of the Company. The words "may," "would," "could," "should," "will," "intend," "plan," "anticipate," "believe," "estimate," "expect," "must," "next," "potential," "progress," "investigate," "optimize," "opportunity," "future," "vision," "envisage," "option," "roadmap," "pursue," and similar expressions, as they relate to the Company or its management, are intended to identify such forward-looking information. Investors are cautioned that statements including forward-looking information are not guarantees of future business activities and involve risks and uncertainties, and that the Company's future business activities may differ materially from those described in the forward-looking information as a result of various factors, including but not limited to fluctuations in the market price of silver and other commodities, successes of the operations of the Company, continued availability of capital and financing, the Company's ability to obtain and renew required permits, licenses, consents, authorizations, and approvals, and general economic, market, and business conditions. There can be no assurances that such forward-looking information will prove accurate, and therefore, readers are advised to rely on their own evaluation of the risks and uncertainties. The Company does not assume any obligation to update any forward-looking information except as required under the applicable securities laws.

Neither the Canadian Securities Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/122761