Rohstoff-Welt.de - Die ganze Welt der Rohstoffe

Pretivm Reports Fourth Quarter and Year End 2013 Results

05.03.2014  |  Marketwired

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Mar 4, 2014) - Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to report the following highlights from the fourth quarter of 2013 and updates for the high-grade gold Brucejack Project in northern British Columbia.

Fourth Quarter 2013 Highlights and Significant Events

Successful 2013 Bulk Sample Program; Updated Resource Estimate

The Program consisted of two elements: the excavation of a 10,000-tonne bulk sample and a 15,000-meter (subsequently increased to a 16,789-meter) underground drill program. The Program was designed to test the full widths of two of the domains of mineralization used to estimate the November 2012 Valley of the Kings Mineral Resource. As a result, the Program targeted the full range of the projected resource block grades which span from zero grams of gold per tonne to in excess of 60 grams of gold per tonne.

The Program was successful in confirming the geological model for the Valley of the Kings, validating the robustness of the global high-grade Mineral Resource estimate, and facilitating parameter optimization for the updated December 2013 Mineral Resource estimate.

The material excavated and processed from the Program produced a total of 5,741 ounces of gold as gravity and flotation concentrates. We have received settlement on 1,674 ounces of the gravity concentrate and are waiting on settlement from the sale of the remainder of the gravity concentrate and flotation concentrate.

December 2013 Resource Estimate

On December 19, 2013, we announced an updated high-grade Mineral Resource estimate for the Valley of the Kings (see news release dated December 19, 2013). The resource estimate, which incorporated all drilling completed to date at the Valley of the Kings, including all drilling from the 2013 exploration program, was completed by Snowden (see the Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013 and filed on SEDAR on February 2, 2014). High-grade gold resources in the Valley of the Kings (5.0 g/t gold-equivalent cut-off) total:

The updated December 2013 Valley of the Kings Mineral Resource estimate, which added Measured mineral resources and increased the gold grade from the November 2012 Valley of the Kings Mineral Resource estimate, is being used to amend the June 2013 Feasibility Study for the Brucejack Project.

Advancing the Brucejack Project: Amending the Feasibility Study and Permitting

The amended Feasibility Study for the Brucejack Project, expected in the second quarter, will additionally use lower metals prices ($1,100/oz gold and $17/oz silver) and an exchange rate of $0.92 CAD:US. Based on the positive results from the bulk sample, potential refinements are being evaluated in the areas of mining, metallurgy and flow-sheet optimization in order to reduce Project capital and operating expenditures. The Brucejack Project is planned as a 2,700 tonnes per day underground mine using the bulk mining method of longhole open stoping with a cemented paste backfill.

The permitting process for an underground mine at the Brucejack Project is now underway. In late November 2013, Pretivm participated in five Open Houses conducted by the BC Environmental Assessment Office (EAO) as part of the first public comment period. We expect to submit our Environmental Assessment Certificate application in late March/early April and engage in the subsequent Provincial and Federal review process with a target of 2016 for commercial production.

2014 Exploration Activities

Underground exploration during 2013 included drifting and cross-cutting of the Cleopatra Structure and Domain 20 and raises on the Cleopatra Structure and the 615L drift. While conducting the underground exploration program, high-grade gold mineralization encountered was bagged for future processing. In January 2014, approximately 1,000 tonnes of this material was transported to the Contact Mill in Montana. Processing of the 1,000 tonnes at the Contact Mill was completed in February 2014. We are waiting on settlement from the sale of the gravity and flotation concentrate produced from the 1,000 tonnes.

An additional 1,000 tonnes of material from the Valley of the Kings is permitted to be excavated and processed in 2014, and we are currently evaluating the optimal high-grade target area for this program.

Planning is also underway for an underground drill program targeting extreme grade mineralization at depth in the Valley of the Kings which could optimize mine planning and also potentially expand the area of known high-grade mineralization.

Ian I Chang, M.A.Sc., P.Eng., Vice President, Project Development, Pretium Resources Inc. is the Qualified Person (QP) responsible for Brucejack Project development. Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

With our current working capital, and pending gold sale receipts and successful completion of our private placement, we believe we will have sufficient funds for our current planned expenditures on our Projects, updating our feasibility study and funding our permitting activities as we advance the Brucejack Project to production.

Pretivm's audited consolidated financial statements and Management Discussion and Analysis for the year ended December 31, 2013 will be filed on SEDAR and available on Pretivm's web site www.pretivm.com.

About Pretivm

Pretivm is creating value through gold at its high-grade gold Brucejack Project, located in northern British Columbia. Permitting of a high-grade underground gold mine at Brucejack is underway, with commercial production targeted to commence in 2016.

(SEDAR filings: Pretium Resources Inc.)

Forward-Looking Statements

This News Release contains "forward-looking information" and "forward looking statements" within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, risks related to satisfying conditions of the Offering, information with respect to our planned exploration and development activities, the adequacy of Pretivm's financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of Pretivm's Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, Pretivm's executive compensation approach and practice, and adequacy of financial resources. Wherever possible, words such as "plans", "expects", "projects", "assumes", "budget", "strategy", "scheduled", "estimates", "forecasts", "anticipates", "believes", "intends", "targets" and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in Pretivm's Annual Information Form dated March 18, 2013 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC's website at www.sec.gov. Forward-looking information is based on the expectations and opinions of Pretivm's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. Neither the TSX nor the NYSE has approved or disapproved of the information contained herein.



Contact

Pretium Resources Inc.
Robert Quartermain
President and Chief Executive Officer
(604)558-1784
Pretium Resources Inc.
Michelle Romero
Vice President, Corporate Relations
(604)558-1784
invest@pretivm.com
www.pretivm.com