|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GoGold Resources Announces Highest Grade Drill Intercept To Date at El Favor East in Los Ricos North02.02.2022 | 12:30 Uhr | CNW
11,307 g/t AgEq over 1.0m within 21.2m of 1,079 g/t AgEq at El Favor East
Last fall, the drill program at El Favor East was focused on following the zone along strike to the east with drill pads built along the historical road to the Constancia mine workings. The first phase of drilling has cut wide zones of high-grade mineralization at vertical depths near 300 metres from surface (see Figure 1). Phase 2 of the drill program will progressively drill both the fill-in holes along strike and the up-dip holes required for the 2022 Mineral Resource estimation. Crews are currently building the roadways and drill pads required to drill the new holes to follow-up on the zones discovered in holes LRGF-21-107 and LRGF-21-109. "The results from these new holes demonstrate the importance of the El Favor East zone," said Brad Langille, President and CEO. "With these high grades and widths at depth as shown in holes 107 and 109, we have the opportunity to quickly increase the mineral resource by simply drilling the zone up to surface. 2022 will be another year of aggressive resource expansion in the Los Ricos district." Table 1: Drill Hole Intersections
The exploration team has been moving east of El Favor with drilling stepouts in the eastern end of El Favor, beginning with discovery hole 48, and continuing to intersect wide strong mineralization. This area is known as the El Favor East zone, and a mapping and drilling program has extended the presence of mineralization 900m to the east of hole 48 (El Favor East zone discovery hole), as shown in Figure 2. To date, approximately 800m of El Favor East has been drilled showing the strong mineralization. The drill holes in this release were not included in the initial Mineral Resource Estimate for Los Ricos North released on December 7, 2021, hole LRGF-21-094 was the final drill hole included in that resource. Table 2: Drill Hole Locations
In September, the company commissioned TMC Exploracion to complete an IP survey using the Pole:Dipole array on the El Favor property. The grid consists of a network of 28 N/S profiles spaced every 100 m from L-2W to L-25E ranging in length from 0.85 to 2.0 km. The survey outlined several high chargeability anomalies representative of the sulphide mineralization along the El Favor - El Favor East zone. A geophysical map showing anomalies and drilling targets is included as Figure 3 below. El Favor is located approximately 800 meters along strike to the east of the El Orito deposit. The longitudinal section in Figure 5 below shows that the combined systems cover approximately 2.9km in mineralized strike length over a 3.7km distance. At El Orito, wide zones of precious and base metal mineralization were cut by drill holes at El Orito at elevations between 600 to 900m. The drill holes at El Favor have cut primarily silver-gold mineralization with trace to minor amounts of base metals at a higher elevation in the system, between 1,050m to 1,400m, compared to the semi-massive to massive base metal sulphide mineralization seen deeper in the El Orito deposit. VRIFY Slide Deck and 3D Presentation The VRIFY Slide Deck and 3D Presentation for GoGold can be viewed at: https://vrify.com/decks/10437 and on the Company's website at: www.gogoldresources.com. Los Ricos District Exploration Projects The Los Ricos North Project was launched in March 2020 and an initial Mineral Resource was announced on December 7, 2021, which disclosed an Indicated Mineral Resource of 87.8 million ounces AgEq grading 122 g/t AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2 million ounces AgEq grading 111 g/t AgEq contained in 20.5 million tonnes. The Company has a drill program for an additional 100,000 metres of drilling for 2022 in place. Procedure, Quality Assurance / Quality Control and Data Verification The sealed and tagged sample bags are transported to the ActLabs facility in Zacatecas, Mexico. ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106?m). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag). Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's QA/QC protocols. Mr. David Duncan, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release. About GoGold Resources CAUTIONARY STATEMENT: This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the Los Ricos South and North projects, and future plans and objectives of GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further discoveries there, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and future events could differ materially from those anticipated in such forward-looking information. Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.
Dieser Artikel stammt von Rohstoff-Welt.de
Die URL für diesen Artikel ist: http://www.rohstoff-welt.de/news/artikel.php?sid=316112
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr! Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert) Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz |