Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Bessor Minerals Inc.
Bessor Minerals Inc.
Registriert in: Kanada WKN: A2PG6U Rohstoffe:
Art: Originalaktie ISIN: CA08650L1094 Gold
Silber
Kupfer
Zink
Heimatbörse: TSX Venture Alternativ: TRYXF
Währung: CAD    
Symbol: BST-H.V Forum:

Troymet Starts Detailed Sampling of Gold and 3DIP Anomalies at Redhill Preparatory to Drilling

11.07.2016 | 14:00 Uhr | Marketwired

NANAIMO, BRITISH COLUMBIA--(Marketwired - Jul 11, 2016) - Troymet Exploration Corp. (TSX VENTURE:TYE) ("Troymet" or the Company") is pleased to report that, preparatory to drilling, a field crew has mobilized to the Alpha zone of the Redhill project to:

  1. Complete detailed soil sampling of the ~900 m x 250 m gold-in-soil anomaly
  2. Prospect the significant chargeability anomalies identified by the recently completed Voltera-3DIP survey
  3. Prospect the VMS prospect which is now recognized as occurring in a prospective volcanic sequence that tracks the contact of the high/low chargeability domains

The gold-in-soil anomaly was first identified by sampling at 50 m stations along 200 m spaced lines. The anomaly will be detailed by sampling at 25 m stations along 100 m spaced infill lines.

The 3DIP survey mapped previously unrecognized and fundamental geologic patterns in the Alpha zone and identified two significant chargeability anomalies. One chargeability anomaly (>20 milliseconds; ~280 m x 260 m) lies just west of the VMS prospect. The second (16-18 milliseconds; ~210 m x 100 m) lies in the southeast part of the grid. Maps of the 3DIP chargeability and resistivity as well as the gold-in-soil anomaly can be viewed at www.troymet.com/projects/redhill/maps-and-photos.

The VMS prospect occurs in a prospective volcanic sequence that tracks the contact of the high/low chargeability domains. The VMS prospect is associated with a 200 m long Fixed Loop Transient EM conductor as well as Borehole Transient EM conductors. Hole RH06-25, re-logged, quartered and re-assayed by Troymet, returned: 8.75% copper, 4.75% zinc, 1.22 g/t gold & 61.19 g/t silver over 2.04 m. The mineralization is open along strike and to depth.

President and CEO, Kieran Downes, P. Geo., a Qualified Person as defined by National Instrument 43-101, has reviewed and verified the technical information provided in this release.

About Troymet Exploration Corp.

Troymet Exploration Corp. is a junior exploration company with a solid treasury and with projects in British Columbia (Redhill and Golden Eagle), Manitoba (McClarty Lake) and Utah (Wildcat). Troymet operates the Wildcat, Redhill and Golden Eagle projects. HudBay Minerals Inc. is the operator of the McClarty Lake joint venture and must contribute $1,151,052 in joint venture expenditures before Troymet is required to fund its participating interest. Troymet retains a 2% net smelter returns royalty (NSR) on the Key property, British Columbia, which was sold to New Gold Inc. in 2013.

TROYMET EXPLORATION CORP.

Kieran Downes, Ph.D., P.Geo.

President, CEO & Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This news release contains certain forward-looking information. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. In particular, this news release contains forward-looking information in respect of: the Redhill Project, including the possible exploration and development of the Redhill Project; the exploration potential and analogous deposit potential of the Redhill Project; future data analysis, sampling plans and exploration plans on the Redhill Project; the timing for exploration and drilling on the Redhill Project; exploration targets and the potential of such exploration targets; and the ability and the timeframe within which the Redhill Project can be advanced. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. This forward-looking information reflects Troymet's current beliefs and is based on information currently available to Troymet and on assumptions Troymet believes are reasonable. These assumptions include, but are not limited to: the current share price of Troymet's common shares and the ability to raise future equity financing, if needed, at prices acceptable to Troymet; Troymet's current and initial understanding and analysis of the Redhill Project; the ability of Troymet to discover viable exploration targets and the results of exploration on the Redhill Project; the cost of exploration, including sampling and drilling, on the Redhill Project; Troymet's general and administrative costs remaining constant; and the market acceptance of Troymet's business strategy.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors which may cause the actual results, level of activity, performance or achievements of Troymet to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the early stage development of Troymet and its projects, and in particular, the Redhill Project; general business, economic, competitive, political and social uncertainties; capital market conditions and market prices for securities, junior market securities and mining exploration company securities; commodity prices; the actual results of current exploration and development or operational activities; competition; changes in project parameters as plans continue to be refined; accidents and other risks inherent in the mining industry; lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting Troymet; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. A description of other assumptions used to develop such forward-looking information and a description of other risk factors that may cause actual results to differ materially from forward-looking information can be found in Troymet's disclosure documents on the SEDAR website at www.sedar.com. Troymet does not undertake to update any forward-looking information except in accordance with applicable securities laws.



Contact

Investor Relations
250-729-0453
info@troymet.com
www.troymet.com

 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz