Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Nouveau Monde Graphite Inc.
Nouveau Monde Graphite Inc.
Registriert in: Kanada WKN: A3CMLY Rohstoffe:
Art: Originalaktie ISIN: CA66979W8429 Graphit
Heimatbörse: TSX Venture Alternativ: NMG
Währung: CAD    
Symbol: NOU.V Forum:

Nouveau Monde Graphite Inc.: Announces the Results of Its Drilling Program Completed in January 2018

01.03.2018 | 12:30 Uhr | Marketwired
Including a 69.5 Meters Interval of 5.08 % Cg Content, Located In the Southern Extension of the West Zone of the Tony Claim Block

SAINT-MICHEL-DES-SAINTS, Mar 1, 2018 - Nouveau Monde Graphite Inc. (TSX VENTURE:NOU) (OTCQX:NMGRF) (FRANKFURT:NM9) ("Nouveau Monde") has the pleasure to announce the results of its January 2018 drilling program in the extension of the West Zone of the Tony claim block, part of its Matawinie graphite property. The results contain intervals of several tens of meters including one at 69.5 meters grading 5.08% Cg. This last drilling campaign sought to increase the graphite resource through the extension of the projected pit towards the south and to maximize the mining plan in view of the feasibility study. The project is located in the Saint-Michel-des-Saints area, some 150 km north of Montreal, Québec, Canada. A prefeasibility study, completed in accordance with the NI 43-101 guidelines, was published in Fall of 2017 (see press release dated October 25th, 2017).

"I am very pleased with the results of the most recent drilling program in the extension of the West Zone of the Tony block because these seem to confirm the presence of a zone reporting content with a higher grade than the current resource estimate. Importantly, this area has very little overburden and outcrops significantly, making for easier access and lower mining costs than other areas of the projected pit. This interesting scenario should positively impact the next mineral resource updates on our West Zone as well as the project's economic factors to be detailed in the feasibility study planned for Fall 2018," explains Éric Desaulniers, President and Chief Executive Officer of Nouveau Monde.

The following files can be downloaded in support of the reading of the paragraphs below:

  • Tony Block location map: https://nouveaumonde.ca/wp-content/uploads/Carte-localisation-du-bloc-Tony_PR_2018-03-01-.pdf
  • West Zone location map : https://nouveaumonde.ca/wp-content/uploads/Carte-localisation-2018-West-Zone-Drilling_PR_2018-03-01-.pdf
  • Section W-0200 : https://nouveaumonde.ca/wp-content/uploads/2018_Tony-Section_W-0200.pdf
  • Section W-0300 : https://nouveaumonde.ca/wp-content/uploads/2018_Tony-Section_W-0300.pdf

Drilling

The January 2018 drilling campaign consisted of 11 holes totaling 2,210 m in the extension of the West Zone of the Tony Claim block. The operation resulted in the extension of the West mineralized zone, which now measures approximately 2.6 km in strike length. The dip of the mineralized horizons varies from sub vertical to around 75° towards the east. The mineralization remains open to the north, to the south and at depth. The mineralized intersections provided by the recent drilling program are presented in Table 1 below.

Table 1: Mineralized intersections provided by the January 2018 drilling program

Drill hole Section From (m) To (m) Mineralized Interval (% Cg)*
TO-18-127 W-0300 12.3 30.4 18.1 m @ 4.47 %
W-0300 54.6 101 46.4 m @ 4.36 %
TO-18-128 W-0100 89 103.1 14.1 m @ 4.77 %
W-0100 105.25 141 35.75 m @ 4.78 %
W-0100 160 170 10.0 m @ 3.73 %
W-0100 174 203 29 m @ 3.15 %
TO-18-129 W-0100 240 276.5 36.5 m @ 4.26 %
W-0100 279 295 16.0 m @ 4.5 %
TO-18-130 W-0200 6.6 19.6 13.0 m @ 3.93 %
W-0200 22.6 43.5 20.9 m @ 3.89 %
W-0200 61.8 72 10.2 m @ 3.04 %
W-0200 87.5 157 69.5 m @ 5.08 %
W-0200 165.2 203.4 38.2 m @ 5.36 %
W-0200 208.7 219.6 10.9 m @ 4.92 %
TO-18-131 W-0200 72 82 10.0 m @ 3.85 %
W-0200 87.5 103 15.5 m @ 5.08 %
W-0200 119 141 22.0 m @ 4.25 %
W-0200 227.3 239.7 12.4 m @ 4.03 %
W-0200 241.6 268 26.4 m @ 5.07 %
W-0200 270.75 300 29.25 m @ 5.05 %
TO-18-132 W-0300 15.8 60.2 44.4 m @ 4.8 %
W-0300 84.5 100.4 15.9 m @ 4.0 %
W-0300 148.35 173.6 25.25 m @ 5.68 %
W-0300 193 234.9 41.9 m @ 4.02 %
TO-18-133 W-0400 6.8 46.2 39.4 m @ 3.79 %
W-0400 50.65 71 20.35 m @ 4.2 %
TO-18-134 W-0400 5 20.9 15.9 m @ 4.51 %
TO-18-135 W-0300 10 30.4 20.4 m @ 3.66 %
TO-18-136 W+0000 59 111.3 52.3 m @ 5.3 %
W+0000 166 177.5 11.5 m @ 4.52 %
W+0000 193.4 204 10.6 m @ 3.25 %
TO-18-137 W+0100 12 22.4 10.4 m @ 2.25 %
W+0100 79 128.4 49.4 m @ 4.72 %
W+0100 188.9 201 12.1 m @ 3.25 %

* Only mineralized intervals over 10 m in length are presented. Mineralized intervals do not represent true width. All samples were analyzed for graphitic carbon (Cg) at the ALS Minerals facilities in North Vancouver, B-C, using a LECO analyzer (ALS internal code C-IR18).

The samples of the 2018 campaign were generally 2 m in length and the core barrel was NQ size (47.6 mm). All the holes from sections W+0000 to W+0100 were more or less oriented N113° (perpendicular to the long axis of the zone), with a dip of -45°, while those from sections W-0100 to W-0400 were oriented N090°, also with a dip of -45°.

To date, 90 core drill holes ranging in length from 36 m to 307 m were completed over the West Zone of the Tony claim block for a total of 16,975.13 m. The graphitic mineralization is mostly encased within paragneiss units.

Quality Assurance - Quality Control

Bernard-Olivier Martel, P.Geo, supervised the January 2018 drilling program. A strict protocol, including the insertion of duplicate and blank samples within the sample stream was adopted as part of a quality assurance and quality control (QA/QC) program. Graphite standards were also included within the borehole sampling protocol. Duplicate, blank and graphite standard sample results returned values within acceptable limits. Mr. Martel performed and supervised the preparation and sample submittal for the drilling program.

The mineralized samples of drill core samples were selected for analysis by Mr. Bernard-Olivier Martel. The mineralized drill core was split into quarters using a rock saw. For each sample, a quarter core sample was individually bagged and sent for analysis, a remaining quarter core sample was kept as a reference and a half core sample was kept for possible metallurgical testing. Samples were all analyzed for graphitic carbon (Cg) content by a LECO analyzer at the ALS Minerals laboratory in North Vancouver (B-C), Canada using their internal code; C-IR18. This laboratory is ISO 9001:2008 and ISO 17025 accredited.

Other developments

Nouveau Monde is actively advancing the development of its graphite project on its Matawinie property. The continuing of the geotechnical studies is scheduled in order to optimize the mining operation plan for the feasibility study. To this end, a hydrogeological study aiming to characterize groundwater movements in the pit sector and a study of the bearing capacity of the soil have both been completed. In order to maximize the process of the commercial plant, additional metallurgical testing is planned by April 2018.

About Nouveau Monde Graphite

In 2015, Nouveau Monde discovered a graphite deposit on its Tony claims block, part of its fully owned Matawanie graphite property. This discovery recently gave rise to the publication of results from a Prefeasibility Study (PFS), released on October 25, 2017, by Nouveau Monde. This PFS demonstrated strong economy with a planned production of 52,000 tpy of high purity flake graphite concentrate, and a mine life of 27 years. The Probable Mineral Reserves identified over the West Zone of the Tony Block totals 33.0 Mt grading 4.39 % Cg. These Reserves are prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum Definitions Standards for mineral resources in concordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (« 43-101 »). The Matawinie graphite project is located in the municipality of Saint-Michel-des-Saints, approximately 150 km north of Montreal. It benefits from direct access to a workforce and the appropriate infrastructure to operate, including abundant and renewable hydroelectric resources. Nouveau Monde's team members are developing this project with the outmost respect for the neighboring communities, while targeting a low environmental impact footprint.

The technical information in this news release was prepared by Bernard-Olivier Martel, P.Geo, and reviewed by Eric Desaulniers, M.Sc., P.Geo, President & CEO of Nouveau Monde Graphite. Both are Qualified Persons as define by NI 43-101.

Subscribe to our newsfeed:

http://nouveaumonde.us12.list-manage.com/subscribe?u=f5e3304c32bfb54992fd9acce&id=603de466df

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

All statements, other than statements of historical fact, contained in this press release including, but not limited to (i) methodology and results; (ii) other developments; and (iii) generally, the "About Nouveau Monde Graphite" paragraphs which essentially describe the Corporation's outlook and objectives, constitute ''forward-looking information'' or ''forward-looking statements'' within the meaning of certain securities laws, and are based on expectations, estimates and projections as of the time of this press release. Forward looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect.

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Further information regarding Nouveau Monde is available in the SEDAR database (
www.sedar.com) and on the Corporation's website at: www.nouveaumonde.ca



Contact

Marie-Eve Chaume, Chief communications officer
+1 (514) 951-5498

 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
Weitere Nachrichten, englisch zu Nouveau Monde Graphite Inc.
01.04.24 NMG Pays Accrued Interests and Grants Options
28.03.24 NMG Provides Commercial and Operational Update upon Filing 2023 Financial Reports: Significant Progress over the Year in Advancing North America’s Mine-to-Battery-Material Graphite Production
28.02.24 NMG Announces the Successful Closing of the US$50 Million Tranche 1 Investment by GM and Panasonic
26.02.24 Nouveau Monde Graphite Inc. Is Gearing up for Its Phase 2 Commercial Operations in Bécancour
15.02.24 Mason Resources Congratulates Nouveau Monde Graphite For Groundbreaking Announcements Securing Offtakes With Panasonic Energy
15.02.24 NMG and Panasonic Energy Announce Binding Offtake Agreement and US$25 Million Private Placement to Secure the Supply of Active Anode Material for North American Battery Production
15.02.24 NMG Announces Offtake Agreement with GM for Canadian Graphite and US$150 Million Equity Investment
15.02.24 NMG Secures Multiyear Offtakes and total US$87.5 Million Investment from Anchor Customers and Strategic Investors to Underpin its Phase 2 Ore-to-Battery-Material Graphite Operations
31.01.24 Mason Resources Announces Closing Of The Sale Of The Lac GuÉret Property To Nouveau Monde Graphite
31.01.24 NMG Announces the Successful Closing of the Previously Announced Acquisition of Mason Resources’ Lac Guéret Graphite Deposit/Uatnan Mining Project
22.01.24 Mason Resources Emerges As Strategic Shareholder Of Nouveau Monde Graphite Through Sale Of Lac GuÉret Graphite Property
mehr »
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz