Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Granada Gold Mine Inc.
Granada Gold Mine Inc.
Registriert in: Kanada WKN: A2G9M7 Rohstoffe:
Art: Originalaktie ISIN: CA38503H2037 Gold
Silber
Heimatbörse: TSX Venture Alternativ: GBBFF
Währung: CAD    
Symbol: GGM.V Forum:

Granada Gold Mine Inc. Closes $1,000,000 Flow-Through Private Placement

10.06.2021 | 0:07 Uhr | CNW
ROUYN NORANDA, June 9, 2021 - Granada Gold Mine Inc. (TSXV: GGM) (the "Company" or "Granada") is pleased to announce that the Company has closed a flow-through private placement financing raising gross proceeds of $1,000,000. The Company has issued 5,714,285 flow-through shares at a price of $0.175 per flow-through share, subject to TSX Venture Exchange ("Exchange") approval.

GloRes Securities Inc., the lead finder for the financing, was paid $70,000 in cash and 300,000 finder's warrants. An additional 100,000 finder warrants were also paid. Each finder warrant is exercisable at $0.175 per share for two years from closing. The finder's fees paid in connection with the private placement are subject to Exchange approval.

All securities issued in connection with the private placement are subject to a four-month and a day hold period expiring on October 10, 2021, in accordance with applicable Securities Laws.

The proceeds of the flow-through Private Placement will be used for surface exploration, trenching, and historical resampling of drill core on the Company's Granada Gold Property in Québec.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. continues to develop the Granada Gold Property near Rouyn-Noranda, Quebec. Approximately 120,000 meters of drilling has been completed to date on the property, focused mainly on the extended LONG Bars zone which trends 2 kilometers east-west over a potential 5.5 kilometers of mineralized structure. The highly prolific Cadillac Break, the source of more than 75 million plus ounces of gold production in the past century, cuts through the north part of the Granada property, but is not necessarily indicative of mineralization hosted on the company's property.

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and a half kilometers. Three of these structures were mined historically from four shafts and three open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 3.5 to 5 grams per tonne gold.

Updated Mineral Resource

The updated resource at the Company's Granada Gold project in Rouyn-Noranda, Quebec was estimated by SGS Canada and outlined in a January 29, 2021 news release. The final report was filed March 15, 2021 with an Effective date of December 15, 2020. The 43-101 Technical Report is titled: Granada Gold Project Mineral Resource Estimate Update, Rouyn-Noranda, Quebec, Canada authored by Yann Camus, P.Eng. and Maxime Dupéré, B.Sc, géo. Both of SGS Canada Inc.

Updated Mineral Resource Estimate Base Case with Details Between the Open Pit Portion and the Underground Portion

Type

Category

Tonnes

Au (g/t)

Gold Ounces

In Pit

Measured1

3,756,000

1.89

228,000

Indicated

1,357,000

2.55

111,000

Measured+Indicated

5,113,000

2.06

339,000

Inferred

34,000

11.29

12,000

Underground

Measured

37,000

4.22

5,000

Indicated

807,000

4.02

104,000

Measured+Indicated

844,000

4.03

109,000

Inferred

1,244,000

6.33

253,000

1.

Cut-off grades are based on a gold price of US$1,600 per ounce, a foreign exchange rate of US$0.76 for CA$1, a gold recovery of 93%

2.

Pit constrained mineral resources are reported at a cut-off grade of 0.9 g/t Au within a conceptual pit shell

3.

Underground mineral resources are reported at a cut-off grade of 3.0 g/t Au within reasonably mineable volumes

The Company is in possession of all mining permits required to commence the initial mining phase, known as the "Rolling Start", which allows the company to mine up to 550 tonnes per day. Additional information is available at www.granadagoldmine.com.

"Frank J. Basa"

Frank J. Basa P. Eng.
President and Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE Granada Gold Mine Inc.



Contact
Frank J. Basa, P. Eng., President and CEO at 1-819-797-4144 or Wayne Cheveldayoff, Corporate Communications, at 416-710-2410 or waynecheveldayoff@gmail.com

 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz