Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Osisko Metals Inc.
Osisko Metals Inc.
Registriert in: Kanada WKN: A2DTZC Rohstoffe:
Art: Originalaktie ISIN: CA6882741094 Gold
Silber
Kupfer
Blei
Zink
Heimatbörse: TSX Venture Alternativ: OMZNF
Währung: CAD    
Symbol: OM.V Forum:

Pine Point Mining Limited Submits Environmental Assessment Reports to NWT Regulators

04.02.2021 | 13:00 Uhr | GlobeNewswire

MONTREAL, Feb. 04, 2021 - Osisko Metals Inc. (the "Company" or "Osisko Metals") (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce that Pine Point Mining Ltd., its 100%-owned subsidiary that controls the Pine Point project, has submitted an Environmental Assessment Initiation Package to the Mackenzie Valley Environmental Impact Review Board. This key step will commence the Environmental Assessment ("EA") process for the Pine Point Project.

The initiation package includes a detailed Project Description, the Developers Assessment Proposal detailing the information to be included in the Developers Assessment Report on which the assessment will be based along with supporting documents.

The EA should be completed in approximately eighteen months. Following the successful conclusion of the EA, permit applications for the proposed mine will be submitted to the Mackenzie Valley Land and Water Board and it is expected to take approximately 12 months to process by the Mackenzie Valley Land and Water Board.

At the completion of the permitting process, the project will be green lighted for the construction and operation of the proposed mine.

Hydrogeological & In-fill Drilling Update

Drilling is progressing at Pine Point with the completion of 2 holes in the R190 prismatic deposit and 2 hydrogeological test holes in the Western and Central Zones of the Project. The Winter program will consist of a total of twenty holes: ten holes designed for hydrogeological & infill, two holes for infill only, and eight holes for hydrogeological purposes only which will be drilled outside of the mineralized trends. Encouragingly, none of the holes drilled to date are producing water to surface. All completed holes will be monitored for water outflow until such time as flow tracing and pumping tests can be performed in Q2 of this year.

About Osisko Metals

Osisko Metals Inc. is a Canadian exploration and development company creating value in the base metal space. The Company controls one of Canada's premier past-producing zinc mining camps, the Pine Point Project, located in the Northwest Territories for which the 2020 PEA has indicated an after-tax NPV of $500M and an IRR of 29.6%. The Pine Point Project PEA is based on current Mineral Resource Estimates that are amenable to open pit and shallow underground mining and consist of 12.9Mt grading 6.29% ZnEq of Indicated Mineral Resources and 37.6Mt grading 6.80% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled "Preliminary Economic Assessment, Pine Point Project, Hay River, North West Territories, Canada" dated July 30, which has been filed on SEDAR. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, paved highway access, and has 100 kilometres of viable haulage roads already in place.

The current Mineral Resources mentioned in this press release conform to NI43-101 standards and were prepared by independent qualified persons, as defined by NI43-101 guidelines. The abovementioned Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see respective technical reports for details).

For further information on this press release, visit www.osiskometals.com or contact:

Robert Wares, CEO
Osisko Metals Inc.
(514) 861-4441
Email: info@osiskometals.com
www.osiskometals.com

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance are not statements of historical fact and constitute forward-looking information. This news release may contain forward-looking information pertaining to the Pine Point Project, including, among other things, the results of the PEA and the IRR, NPV and estimated costs, production, production rate and mine life; the expectation that the Pine Point Project will be an robust operation and profitable at a variety of prices and assumptions; the expected high quality of the Pine Point concentrates; the potential impact of the Pine Point Project in the Northwest Territories, including but not limited to the potential generation of tax revenue and contribution of jobs; and the Pine Point Project having the potential for mineral resource expansion and new discoveries. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: favourable equity and debt capital markets; the ability to raise additional capital on reasonable terms to advance the development of its projects and pursue planned exploration; future prices of zinc and lead; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; operating conditions being favourable; political and regulatory stability; the receipt of governmental and third party approvals; licences and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of equipment; and positive relations with local groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company's public documents filed at www.sedar.com. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.


 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz