Wir verwenden Cookies, um Ihnen eine optimale Funktion der Webseite zu ermöglichen. Wenn Sie weitersurfen, stimmen Sie der Cookie-Nutzung zu. Mehr erfahren
In Ihrem Webbrowser ist JavaScript deaktiviert. Um alle Funktionen dieser Website nutzen zu können, muss JavaScript aktiviert sein.
RohstoffWelt - Die ganze Welt der Rohstoffe HomeKontaktRSS
Powered by: Powered by GoldSeiten.de
 
[ Druckversion ]
Silver Bull Resources Inc.
Silver Bull Resources Inc.
Registriert in: Kanada WKN: A2QES0 Rohstoffe:
Art: Originalaktie ISIN: US8274582092 Silber
Blei
Zink
Heimatbörse: TSX Alternativ: SVBL
Währung: CAD    
Symbol: SVB.TO Forum:

Silver Bulll Resources Inc. Extends Sierra Mojada Strike Length by 950m in Coahuila, Mexico

19.06.2019 | 13:00 Uhr | GlobeNewswire
Intersects 1.35 Meters of Mineralization Grading 10.47% Zinc, 8.25% Lead, & 586g/t Silver, and 1.8 Meters Grading 12.2% Zinc, 1.4% Lead & 53g/t Silver in Coahuila

VANCOUVER, June 19, 2019 - Silver Bull Resources Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) is pleased to provide results from its first two drill holes on the Sierra Mojada Project in Coahuila, Northern Mexico.

Highlights from the first two holes announced in this news release include:

  • Hole B19001 – 1.35 meters @ 10.47% zinc, 8.25% Lead and 586g/t silver and 1.8 meters @ 12.20% zinc, 1.4% lead, and 53g/t silver of mixed oxide/sulphide mineralization.
  • Hole B19002 – 2.05 meters @ 7.81% zinc, 1.5% Lead and 36g/t silver of mixed oxide/sulphide mineralization

The Drill Program: Under a joint venture option agreement with South32, Silver Bull is conducting an initial 8,000 meter surface drill program targeting a series of possible sulphide extensions at depth to the main deposit, as well as a series of never before tested targets within the wider area.

For drilling, the company is using Major Drilling De Mexico S.A de C.V to initially target four historic mining areas within the property, three of which have never been drilled.

Results:
A summary of the results from the preliminary drilling east of the main deposit are shown in the table and map below.

Hole ID Hole Length (m) From To Interval (m) Ag G/T Zn (%) Pb (%) Comments
B19001 380.7 318.2 320 1.8 53 12.2 1.4
335.65 337 1.35 586 10.47 8.25 high grade zone within a low grade halo of 13.35m @ 95g/t Ag, 1.3% Zn, 0.98% Pb
B19002 682.6 332.3 334.75 2.05 36 7.81 1.5 high grade zone within a low grade halo of 40.45m @ 8g/t Ag, 0.93% Zn, 0.22% Pb
B19003 620.85 Results Pending
Figure 1. Table summarizing the results of the first two drill holes in the current drill program. B19002 removes underground workings of 0.4 meters in the interval from 332.3 meters to 334.75 meters.

Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c5ca75b2-4488-4487-a891-71ed179d8e8a. Location of the drill holes relative to the main deposit at Sierra Mojada. B19001 sits approximately 950 meters east of the defined deposit and shows mineralization continues along trend. Drill holes B19001 and B19002 sit along the very northern edge of the main deposit trend with the guts of the main trend lying further to the south.

Tim Barry, President, CEO and director of Silver Bull states, “The results from the first two holes in the East End are very encouraging. We have extended the mineralization an additional 950 meters to the east along strike of the Sierra Mojada Deposit, and show mineralization is far from drilled off in the area. Our interpretation of the results is that the drill holes clip the very northern edge of the main trend of Sierra Mojada deposit, and the guts of the system still lies to the south, untested. What is also encouraging is we are seeing a change from oxide mineralization to sulphide mineralization as we go deeper into the system. The advantage of sulphide mineralization over oxide mineralization, and why it is the target of this drill program is that it tends to be higher grade and will likely have a more standard metallurgical process to concentrate the ore. Since finishing up the B19003 drill hole in this area the drill has now moved off to the Palomas Negras prospect which sits 9 kilometers to the west of the main deposit. Results from the drilling at Palomas Negras are expected shortly.”

Sample Analysis and QA/QC: All samples have been analyzed at ALS Chemex in North Vancouver, BC, Canada. Samples are first tested with the "ME-ICP41m" procedure which analyzes for 35 elements using a near total aqua regia digestion. Samples with silver values above 100ppm are re-analyzed using the Ag-GRA21 procedure which is a fire assay with a gravimetric finish. Samples with zinc, lead, and copper values above 10,000ppm (1%) are re-analyzed using the AA46 procedure which is a near total aqua regia digestion with an atomic absorption finish.

A rigorous procedure is in place regarding sample collection, chain of custody and data entry. Certified standards and blanks, as well as duplicate samples are routinely inserted into all sample shipments to ensure integrity of the assay process.

South32 Joint Venture Option: In June 2018 Silver Bull signed an agreement with a wholly owned subsidiary of South32 whereby Silver Bull has granted South32 an option to form a 70/30 joint venture with respect to the Sierra Mojada Project. To maintain the option in good standing, South32 must contribute minimum exploration funding of US$10 million ("Initial Funding") during a 4 year option period with minimum aggregate exploration funding of US$3 million, US$6 million and US$8 million to be made by the end of years 1, 2 and 3 of the option period respectively. South32 may exercise its option to subscribe for 70% of the shares of Minera Metalin S.A. De C.V. ("Metalin"), the wholly owned subsidiary of Silver Bull which holds the claims in respect of the Sierra Mojada Project, by contributing US$100 million to Metalin for Project funding, less the amount of the Initial Funding contributed by South32 during the option period.

About Silver Bull: Silver Bull is a well-financed mineral exploration company whose shares are listed on the Toronto Stock Exchange and trade on the OTCQB in the United States, and is based out of Vancouver, Canada. The Sierra Mojada Project is located 150 kilometers north of the city of Torreon in Coahuila, Mexico, and is highly prospective for silver and zinc.

About the Sierra Mojada deposit: Sierra Mojada is an open pittable oxide deposit with a NI43-101 compliant measured and indicated "global" resource of 70.4 million tonnes grading 3.4% zinc and 38.6g/t silver at a $13.50 NSR cutoff giving 5.35 billion pounds of zinc and 87.4 million ounces of silver. Included within the "global" resource is a measured and indicated "high grade zinc zone" of 13.5 million tonnes with an average grade of 11.2% zinc at a 6% cutoff, giving 3.336 billion pounds of zinc, and a measured and indicated "high grade silver zone" of 15.2 million tonnes with an average grade of 114.9g/t silver at a 50g/t cutoff giving 56.3 million ounces of silver. Mineralization remains open in the east, west, and northerly directions. Approximately 60% of the current 3.2 kilometer mineralized body is at or near surface before dipping at around 6 degrees to the east.

The technical information of this news release has been reviewed and approved by Tim Barry, a Chartered Professional Geologist (CPAusIMM), and a qualified person for the purposes of National Instrument 43-101.

On behalf of the Board of Directors
"Tim Barry"

Tim Barry, CPAusIMM
Chief Executive Officer, President and Director

INVESTOR RELATIONS:
+1 604 687 5800
info@silverbullresources.com

Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated, and Inferred Resources: This press release uses the terms "measured resources", "indicated resources", and "inferred resources" which are defined in, and required to be disclosed by, NI 43-101. We advise U.S. investors that these terms are not recognized by the United States Securities and Exchange Commission (the "SEC"). The estimation of measured, indicated and inferred resources involves greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that measured and indicated Mineral Resources Ltd. will be converted into reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. U.S. investors are cautioned not to assume that estimates of inferred Mineral Resources Ltd. exist, are economically mineable, or will be upgraded into measured or indicated Mineral Resources Ltd.. Under Canadian securities laws, estimates of inferred Mineral Resources Ltd. may not form the basis of feasibility or other economic studies.

Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations, however the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures. Accordingly, the information contained in this press release may not be comparable to similar information made public by U.S. companies that are not subject NI 43-101.

Cautionary note regarding forward looking statements: This news release contains forward-looking statements regarding future events and Silver Bull's future results that are subject to the safe harbors created under the U.S. Private Securities Litigation Reform Act of 1995, the Securities Act of 1933, as amended (the "Securities Act"), and the Securities Exchange Act of 1934, as amended (the "Exchange Act"), and applicable Canadian securities laws. Forward-looking statements include, among others, statements regarding mineral resource estimates, mineralization not being drilled off east along strike of the Sierra Mojada Deposit, the guts of the system being untested, change from oxide mineralization to sulphide mineralization deeper in the system, sulphide mineralization being high grade and having a more standard metallurgical process to concentrate ore and timing of expected drilling results. These statements are based on current expectations, estimates, forecasts, and projections about Silver Bull's exploration projects, the industry in which Silver Bull operates and the beliefs and assumptions of Silver Bull's management. Words such as "expects," "anticipates," "targets," "goals," "projects," "intends," "plans," "believes," "seeks," "estimates," "continues," "may," variations of such words, and similar expressions and references to future periods, are intended to identify such forward-looking statements. Forward-looking statements are subject to a number of assumptions, risks and uncertainties, many of which are beyond our control, including such factors as the results of exploration activities and whether the results continue to support continued exploration activities, unexpected variations in ore grade, types and metallurgy, volatility and level of commodity prices, the availability of sufficient future financing, and other matters discussed under the caption "Risk Factors" in our Annual Report on Form 10-K for the fiscal year ended October 31, 2018, as amended, and our other periodic and current reports filed with the SEC and available on www.sec.gov and with the Canadian securities commissions available on www.sedar.com. Readers are cautioned that forward-looking statements are not guarantees of future performance and that actual results or developments may differ materially from those expressed or implied in the forward-looking statements. Any forward-looking statement made by us in this release is based only on information currently available to us and speaks only as of the date on which it is made. We undertake no obligation to publicly update any forward-looking statement, whether written or oral, that may be made from time to time, whether as a result of new information, future developments or otherwise.

 
Bookmarken bei Mister Wong Furl YiGG Wikio del.icio.us Webnews
A A A Schriftgröße
 
 
 
© 2007 - 2024 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)

Werbung | Mediadaten | Kontakt | AGB | Impressum | Datenschutz