Freeman Gold Corp. is pleased to report geochemical results from the newly discovered Beauty Zone. This zone lies approximately 600 metres west of the Lemhi Gold Deposit where Freeman recently reported a maiden Mineral Resource Estimate on July 8, 2021. The untested Beauty Zone lies wholly within Freeman's patented mining claims and is defined by a 350 metre by 250 metre coincidental gold in rock and soil anomaly [...]
Freeman Gold Corp. is pleased to report results from initial metallurgical testing on drill core material from its Lemhi Gold Project in Idaho. The test work has shown consistently high gold extractions exceeding 95% over a wide spatial area for a range of head grades that vary between 0.4 to 2.1 g/t Au. The excellent leach response indicates that cyanide tank leaching, with a moderately ground sample using a gravity [...]
Freeman Gold Corp. is pleased to announce that it has closed its strategic non-brokered private placement offering issuing an aggregate of 11,537,692 units at $0.26 per Unit for gross proceeds of $2,999,799.92. Each Unit consists of one common share in the capital of the Company and Share purchase warrant exercisable at $0.35 for 36 months from the date of issuance into an additional Share. The Warrants are subject to [...]
Freeman Gold Corp. is pleased to announce it has appointed Mr. Paul Matysek as the Company's Executive Chairman. Mr. Matysek's unique qualifications, experience and unprecedented string of successful transactions in the mining sector will create value for the Company as it advances its Lemhi Gold Project. As members of the Strategic Advisory Committee, Mr. Matysek, along with Freeman CEO William Randall and CFO Bassam [...]
Freeman Gold Corp. is pleased to announce that it has filed on SEDAR a National Instrument 43-101 compliant, independent technical report on its 100% owned Lemhi Gold Project located in Idaho. The Report summarizes the results of the maiden Mineral Resource Estimate conducted on the Lemhi Gold Project. The MRE was completed by APEX Geoscience Ltd. of Edmonton, Alberta. Highlights of the filed Report include: The pit [...]
The Lemhi Mineral Resource Estimated was constructed with 64,391 m of drilling in 364 holes completed between 1983 and 2020; The resource is modelled as amenable to open pit mining using standard, low cost gold leaching technologies, including carbon in leach and heap leach processing; The pit constrained MRE using a 0.5 g.t cut off and a gold price of US$1,550 per troy ounce is comprised of: Indicated MRE of 749,800 oz [...]
11 high priority target areas have been defined for follow-up exploration on the Lemhi property 633 soil samples and 145 rock grab and channel samples analysed 565 line km of ground magnetics and 1.4 sq. km of 3D IP Data surveyed, and integrated with finalized historical data compilation and interpretation finalized Grab samples discovered 5 targets with a total of 54 samples >1 g/t Au with assay values up to 450 g/t Au [...]
Freeman releases the highest grade intercept ever drilled at Lemhi from the remaining 20 diamond drill holes of the 2020 35-hole drill program Highlights include: 2.5 g/t Au over 151m, including 25 g/t Au over 8.7m ; 1.2 g/t Au over 42.6m ; 0.9 g/t Au over 72.4m, including 2.1 g/t Au over 21.1m ; and 1.4 g/t Au over 48.4m, including 2.1 g/t over 22m As a result of the 2020 drill program and increased drill density the [...]
Freeman Gold Corp. is pleased to provide assay results of core from an additional 11 of 34 diamond drill holes on Freeman's 100% owned Lemhi Gold Project located in Idaho. The objective of the 2020 Phase 1 drill program was designed to confirm historical mineralization and allow the use of over 355 historical drill holes in a maiden National Instrument 43-101 compliant resource estimate. The drill program focused on [...]
Freeman Gold Corp. has commenced metallurgical test work on its 100% owned Lemhi Gold Project located in Idaho, USA. This work is part of Freeman's integrated technical program to advance towards a production decision. A comprehensive review of the historical information and test work conducted by previous operators has been completed. Freeman's metallurgical team has designed a test work program to follow-up and enhance [...]
Freeman Gold Corp. is pleased to provide assay results of core from four of 34 diamond drill holes on Freeman Gold's 100% owned Lemhi Gold Project located in Idaho. The objective of the 2020 Phase 1 drill program was designed to confirm historical mineralization and allow the use of over 355 historical drill holes in a maiden National Instrument 43-101 compliant resource estimate. The drill program focused on infill and [...]
Freeman Gold Corp. Will Randall, President and CEO, is pleased to provide an update for its 100% owned Lemhi gold project, located in Idaho. Two diamond drill rigs completed 35 cored drill holes totaling 7,149 m. The drilling campaign confirmed the presence of numerous structurally controlled stacked, flat lying gold mineralized horizons initially identified by 70,196 meters of historical drilling conducted between 1984 [...]