• Sonntag, 04 Mai 2025
  • 14:13 Frankfurt
  • 13:13 London
  • 08:13 New York
  • 08:13 Toronto
  • 05:13 Vancouver
  • 22:13 Sydney
JZR Gold Inc.
Bergbau
Originalaktie
A3DTYV / CA4822311078
Minengesellschaft
AuAgPtPdCuNiZn

Brasilien

  • Jazz Resources announces that the BC Ministry of Forestry and Range has temporarily reduced the load limit on the Fish River Canyon Bridge to 10 tons. The reduced load limit will remain in effect until engineers can determine the safety of rock bolting on a bluff above the bridge. At the present time the reduced load limit will have a minimal impact on Jazz Resources Inc.
    13.05.2013
    von CNW
  • Jazz Resources has been issued a permit for a pilot mill and tailings pond from the BC Ministry of Energy and Mines at the former Spider mine mill site near Camborne B.C. The mill will be used to process bulk samples of mineralization from the Company's Teddy Glacier property. The mill site was historically used for processing ore from the adjacent Spider Mine. The old mill operated from 1952 to 1958. J. T. Shearer [...]
    09.01.2013
    von CNW


© 2007 - 2025 Rohstoff-Welt.de ist ein Mitglied der GoldSeiten Mediengruppe
Es wird keinerlei Haftung für die Richtigkeit der Angaben übernommen! Alle Angaben ohne Gewähr!
Kursdaten: Data Supplied by BSB-Software.de (mind. 15 min zeitverzögert)